My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I <br />E. Installation <br />1. Unless otherwise noted on the Drawings, top of cabinets shall not <br />exceed 60 inches above grade, properly aligned and adequately <br />supported independently of the connecting raceways. <br />' 2. All wiring in panelboards shall be neatly formed, grouped, laced, and <br />identified to provide a neat and orderly appearance. A typewritten <br />directory card identifying all circuits shall be placed in the card holder <br />inside the front cover. <br />1 2.05 UNDERGROUND SYSTEM <br />A. Materials <br />1 . Ducts shall be polyvinyl chloride (PVC Schedule 40) installed on clean <br />fine sand. No rocks or debris shall be allowed as trench fill. <br />2. Cable racks, supports, pulling -in irons, and hardware shall be galvanized <br />steel manufactured by Cope or approved equal, or provided as required. <br />3. Precast P ullboxes shall be heavy duty type, designed for a Class H2O <br />wheel load. Precast pullboxes shall be as manufactured by Brooks <br />iProducts Co., or approved equal. <br />' 4. Handhole covers and frames shall be traffic rated, H2O class, provided <br />as required and grounded to the system ground. <br />B. <br />Ducts shall be installed to drain away from panels; ducts between pullboxes <br />shall drain toward the pullbox. Duct slopes shall not be less than 3 inches per <br />100 feet. <br />C. <br />Duct lines shall be laid in trenches on a clean backfill bedding. <br />' <br />D. <br />The minimum cover for duct lines shall be as specified. <br />' <br />E. <br />PVC duct terminations at pullboxes shall be with PVC and bells. <br />F. <br />Where bends in ducts are required, long radius elbows, sweeps and offsets <br />shall be used. <br />G. <br />All ducts shall be rodded and a mandrel drawn through followed by a swab to <br />lean out any obstructions which may cause cable abrasions. The mandrel <br />shall be 12 inches in length and the diameter '' /2- inchless than the inside <br />diameter of the duct. <br />i <br />07/03 <br />16050 -8 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.