My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BK Marina Construction Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
BK Marina Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 8:59:44 AM
Creation date
1/6/2011 1:53:42 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR -17 -04 09:46AM FROM -CITY OF SUNNY ISLES BEACH +3059493113 T -589 P.03/17 F -147 <br />EXHIBIT A <br />CITY OF SUNNY ISLES — SEAWALL. REPLACEMENT & RESTORATION <br />UNIT PRICE RID SCHEDULE <br />Item Estimated <br />Estimated <br />No. Description Quantit Unit <br />Unit Price <br />Amount <br />1. Mobilization ofEgaipment and personnel 1 Lump <br />a/O.9 Z 9s -_.00 <br />(Less than or equal to 10% of the total bid) <br />p+o <br />2. Restoration of Atlantic Ave. Seawall 1 Lump <br />$ bl -00 <br />$ b 9,. D •00 <br />(Ropiace cap $ tiebacks) <br />3- Restoration of Atlantic Ave. Bridge Revetment l Lump <br />$ 00 <br />$ Z ]8Y___00 <br />(Install sheetpile toe wall, concrete footer. <br />replace concrete cap, install l eotextile cloth, <br />bacldill and re -sod) <br />4. Replacement of 183�d St. Seawall 1 Lump <br />$/ .00 <br />$ i 6 % .00 <br />(install vertical & batter piles, concrete panels, <br />cast in place concrete cap, install geotextile <br />clout, bacMl, grade and re -sod) <br />5. Site cleanup and site restoration at all three 1 Lump <br />$ �OGY%00 <br />$ S, DD U, .00 <br />locations, demobilization. <br />TOTAL BID PRICE: ITEMS 1 -5 <br />$ , 29A.00 <br />Date Available to begin work: <br />The total of Item Nos. 1, 2, 3, 4 and 5 for the restoration and replacement of the above�enI.oiled seawalls is C2--ice <br />1 n n I A 4- 7f 1: `t-20 _ n 7417.7— I _ - . . ✓..l% nI ii% �' /�l,/.� d, <br />and V V cents (in words). <br />Authorized Signet <br />Date l a <br />(Print Name) J r' C/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.