Laserfiche WebLink
' <br />1. No separate payment will be made for: <br />a. Record Drawings <br />b. Construction of haul roads as may be required. <br />C. Testing <br />F. <br />Unit Price Abbreviations: <br />1. Lineal Feet - LF <br />2. Acre - AC <br />3. Cubic Yard - CY <br />4. Square Yard - SY <br />5. Each - EA <br />6. Lump Sum - LS <br />7. Ton - TN <br />' <br />8. Net Mile - NM <br />9. Gross Mile - GM <br />10. Gallons - GA <br />' <br />11. Thousand Gallons - MG <br />' <br />PART 2 - <br />PRODUCTS (Not applicable) <br />PART 3 - <br />EXECUTION <br />AND PAYMENT <br />3.01 MEASUREMENT <br />' <br />A. <br />Electrical <br />1. Lump sum <br />B. <br />Contingency: See Specification Section 01021, "Cash Allowances." <br />C. <br />The Project Mobilization <br />' <br />1. The project mobilization item shall be administered in accordance <br />with the Florida Department of Transportation, Standard <br />Specifications for Road & Bridge Construction (latest edition); <br />MOBILIZATION. <br />2. The maximum amount allowed for the mobilization and <br />demobilization item shall be five (5) percent of the total contract <br />' <br />amount. <br />3. Mobilization includes, but is not limited to, mobilization of <br />equipment, all surveying, all supervision, cost of all bonds and <br />warranties, all permit fees, all insurance and demobilization. <br />i <br />05104 <br />01025 -2 03 -4465 <br />