My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />n <br />1 <br />I r7 i <br />C. The Engineer and Owner reserve the right to require the Contractor to work <br />24 hours per day in all cases where, in their opinion, interference with <br />operation of the system may result. <br />D. In no case will the Contractor be permitted to interfere with the existing <br />system until all materials, supplies, equipment, tools and incidentals <br />necessary to complete the interfering portion of the work are on the site. All <br />existing utilities shall be pothole located prior to construction of conflicting <br />yard piping. <br />1.05 UTILITY CROSSINGS <br />A. It is intended that wherever existing utilities such as water, chemical, <br />electrical or other service lines must be crossed, deflection of the pipe <br />within recommended limits and cover shall be used to satisfactorily clear the <br />obstruction unless otherwise indicated on the Drawings. However, when in <br />the opinion of the Owner or Engineer this procedure is not feasible he may <br />direct the use of fittings for a utility crossing as detailed on the Drawings. All <br />existing utilities shall be pothole located prior to construction of conflicting <br />yard piping. <br />1.06 CONNECTIONS TO EXISTING SYSTEMS <br />A. The Contractor shall perform all work necessary to locate, excavate and <br />prepare for connections to the terminus of the existing mains all as shown <br />on the Drawings or where directed by the Owner. The cost of this work and <br />for the actual connection of the existing mains shall be included in the bid <br />price for the pipe installation and shall not result in any additional cost to the <br />Owner. <br />1.07 RELOCATIONS <br />A. The Contractor shall be responsible for the relocation of structures, <br />including but not limited to light poles, signs, sign poles, fences, piping, <br />irrigation conduits and drains that interfere with the positioning of the work <br />as set out on the Drawings. The cost of all such relocations shall be <br />included in the bid for the project and shall not result in any additional cost <br />to the Owner. <br />1.08 WARRANTIES <br />05114 <br />A. All equipment supplied under these Specifications shall be warranted by the <br />Contractor and the equipment manufacturers for a period of one (1) year, <br />unless otherwise specified. Warranty period shall commence on the date of <br />Owner acceptance. <br />01030 -2 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.