Laserfiche WebLink
1.11 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the <br />manufacturers representative to be present on the site for inspection and <br />testing, if the equipment fails to perform as specified then the representative <br />shall remain on site until the malfunction is corrected and the Owner <br />received specified days of inspection or testing. <br />B. The cost for the additional days required shall not be added to the cost of <br />the Owner, but shall be to the account of the Contractor. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />END OF SECTION <br />05/04 01030 -4 03 -4465 <br />