My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />L_ _l <br />1 <br />I <br />it <br />G. The Contractor shall be responsible for and bear all cost of damages <br />which may result from the ordering of any material or from proceeding with <br />any part of work prior to the review by Engineer of the necessary Shop <br />Drawings. <br />1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />05114 <br />A. The Engineer's review of drawings, data, and samples submitted by the <br />Contractor will cover only general conformity to the Specifications, <br />external connections, and dimensions which affect the installation. The <br />Engineer's review will not constitute an approval of dimensions, quantities, <br />and details of the material, equipment, device, or item shown. <br />B. The review of drawings and schedules will be general and shall not be <br />construed: <br />1. as permitting any departure from the Contract requirements; <br />2. as relieving the Contractor of responsibility for any errors, including <br />details, dimensions, and materials; <br />3. as approving departures from details furnished by the Engineer, <br />except as otherwise provided herein. <br />C. If the drawings or schedule as submitted describe variations per <br />subparagraph (1.05.C), and show a departure from the Contract <br />requirements which Engineers finds to be in the interest of the Owner and <br />to be minor as not to involve a change in the Contract Price or time for <br />performance, the Engineer may return the reviewed drawings without <br />noting an exception. <br />D. When reviewed by the Engineer, each of the Shop Drawings will be <br />identified as having received such review being so stamped and dated. <br />Shop Drawings stamped "REJECTED" and with required corrections <br />shown will be returned to the Contractor for correction and resubmittal. <br />E. Resubmittals will be handled in the same manner as the first submittals. <br />On resubmittals, the Contractor shall direct specific attention, in writing or <br />on resubmitted Shop Drawings, to revisions other than the corrections <br />requested by the Engineer on previous submissions. The Contractor shall <br />make any corrections required by the Engineer. <br />F. If the Contractor considers any correction indicated on the drawings to <br />constitute a change to the Contract Drawings or Specifications, the <br />Contractor shall give written notice thereof to the Engineer. <br />G. The Engineer will review a submittal /resubmittal a maximum of two (2) <br />times after which cost of review will be borne by the Contractor. The cost <br />of engineering shall be equal to the Engineer's charges to the Owner <br />under the terms of the Engineer's agreement with the Owner. <br />01340 -3 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.