My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br /> <br />Add the following: <br /> <br />10.06. Without invalidating the agreement, Owner may, at any time execute appropriate <br />Change Orders for additions and/or deletions in the work of up to 25 % of the total <br />contract amount, without a change in the contract unit prices bid. <br /> <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR <br />ACCEPTANCE OF DEFECTIVE WORK <br /> <br />13.03. TEST AND INSPECTIONS: <br /> <br />Replace 13.03.B. with "All testing shall be paid for by the Contractor." <br /> <br />Add the following sentence to Paragraph 13.07 .A.: "Specific and special warranties <br />specified in the Contract Documents are in addition to, and not in lieu of, the contractors <br />general warranty. CONTRACTOR shall not be relieved of general warranty obligations by <br />the specification of specific products or procedures." <br /> <br />13.09. OWNER MAY CORRECT DEFECTIVE WORK: <br /> <br />Change the first line from: <br /> <br />If Contractor fails within a reasonable time after written notice of Engineer... <br /> <br />To read: <br /> <br />If Contractor fails within ten (1 0) calendar days after written notice of Engineer... <br /> <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br /> <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days <br />before each progress payment is scheduled (but not more often than once a month), ..." to <br />read "By no later than the first day of the month, ...". <br /> <br />Add 14.02.A.4: "An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each subsequent <br />application thereafter. For each application for payment (excluding Application No.1) the <br />Contractor shall submit with the application Partial Releases of Liens for all Notice to <br />Owners that have been received for the project by the Owner and Engineer". <br /> <br />In Paragraph 14.02.B., change the beginning of the sentence from "Ten days..." to read <br />"Forty-five days...". <br /> <br />In the first sentence of Paragraph 14.05.A.2., following the word "...Work...", insert the <br />words" .. .or to place and install equipment...". <br /> <br />At the end of Paragraph 14.07.A.2. after, ...with the Work. Insert, "(iv) acceptance by the <br />Owners and governing agencies." <br />07/04 00800-6 03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.