My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />H. When the Shop Drawings have been completed to the satisfaction of the <br />Engineer, the Contractor shall carry out the construction in accordance <br />therewith and shall make no further changes therein except upon written <br />instructions from the Engineer. <br /> <br />I. No partial submittals will be reviewed. Submittals not complete will be <br />returned to the Contractor, and will not be considered "Rejected" until <br />resubmitted. <br /> <br />1.05 SHOP DRAWINGS <br /> <br />A. When used in the Contract Documents, the term "Shop Drawings" shall be <br />considered to mean Contractor's plans for material and equipment which <br />become an integral part of the Project. These drawings shall be complete <br />and detailed. Shop Drawings shall consist of fabrication, erection and <br />setting drawings and schedule drawings, manufacturer's scale drawings, <br />and wiring and control diagrams. Cuts, catalogs, pamphlets, descriptive <br />literature, and performance and test data, shall be considered only as <br />supportive to required Shop Drawings as defined above. <br /> <br />B. Drawings and schedules shall be checked and coordinated with work of all <br />trades involved, before they are submitted for review by the Engineer and <br />shall bear the Contractor's stamp of approval as evidence of such <br />checking and coordination. Drawings or schedules submitted without this <br />stamp of approval shall be returned to the Contractor for resubmission. <br /> <br />C. Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, <br />located adjacent to the title block. The title block shall display the <br />following: <br /> <br />1. Number and title of the drawing. <br />2. Date of drawing or revision. <br />3. Name of project building or facility. <br />4. Name of contractor and subcontractor submitting drawing. <br />5. Clear identification of contents and location of work. <br />6. Specification title and number. <br /> <br />D. If drawings show variations from Contract requirements because of <br />standard shop practice or for other reasons, the Contractor shall describe <br />such variations in his letter of transmittal. If acceptable, proper adjustment <br />in the Contract shall be implemented where appropriate. If the Contractor <br />fails to describe such variations he shall not be relieved of the <br />responsibility for executing the work in accordance with the Contract, even <br />though such drawings have been reviewed. <br /> <br />07/04 <br /> <br />01340-4 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.