My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />..- <br /> <br />SECTION 01720 <br /> <br />PROJECT RECORD DOCUMENTS <br /> <br />PART 1 - GENERAL <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />A. Maintain at the site for the Owner one record copy of: <br /> <br />1. Drawings <br />2. Specifications <br />3. Addenda <br />4. Change Orders and other Modifications to the Contract <br />5. Engineer's Field Orders or Written Instructions <br />6. Approved Shop Drawings, Working Drawings, and Samples <br />7. Field Test Reports <br />8. Construction Photographs <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Section 01050: Field Engineering <br /> <br />B. Section 01340: Shop Drawings, Working Drawings, and Samples <br /> <br />C. Section 01701: Contract Closeout <br /> <br />1.03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> <br />A. Store documents and samples in Contractor's field office apart from <br />documents used for construction. <br /> <br />B. File documents and samples in accordance with CSI format number <br />system. <br /> <br />C. Maintain documents in a clean, dry, legible condition and in good order. <br />Do not use record documents for construction purposes. <br /> <br />D. Make documents and samples available at all times for inspection by the <br />Engineer. <br /> <br />E. As a prerequisite for monthly progress payments, the Contractor is to <br />exhibit the currently updated "record documents" for review by the <br />Engineer and the Owner. <br /> <br />07/04 <br /> <br />01720-1 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.