My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Major Subcontractors. <br />f. Major Suppliers. <br />g. Utilities. <br />h. Others as appropriate. <br />D. Suggested Agenda: <br />1. Distribution and discussion of: <br />a. List of major subcontractors and suppliers. <br />b. Projected Construction Schedule. <br />2. Critical work sequencing /critical path scheduling. <br />3. Major equipment deliveries and priorities. <br />4. Project Coordination. <br />a. Designation of responsible personnel. <br />5. Procedures and processing of: <br />a. Field decisions. <br />b. Proposal requests. <br />C. Submittals. <br />d. Change Orders. <br />e. Applications for Payments. <br />6. Adequacy of Distribution of Contract Documents. <br />7. Procedures for maintaining Record Documents. <br />8. Use of Premises: <br />a. Office, Work and Storage Areas. <br />b. Owner's Requirements. <br />9. Construction facilities, controls and construction aids. <br />10. Temporary Utilities. <br />1.04 PROGRESS MEETINGS <br />A. Schedule regular periodic meetings. The progress meetings will be held as required by <br />progress of the work. <br />B. Hold called meetings as required by progress of the work. <br />C. Location of the meetings: Project field office of the Contractor or Engineer. <br />D. Attendance: <br />1. Engineer, and his professional consultants as needed. <br />2. Subcontractors as appropriate to the agenda. <br />12/04 01200 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.