My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />A. The Engineer's review of drawings, data and samples submitted by the Contractor will <br />cover only general conformity to the Specifications, external connections, and dimensions <br />that affect the installation. The Engineer's review and exceptions if any, will not constitute <br />an approval of dimensions, quantities, and details of the material, equipment, device, or <br />item shown. <br />1 B. The review of drawings and schedules will be general, and shall not be construed: <br />1. As permitting any departure from the Contract requirements; <br />' 2. As relieving the Contractor of responsibility for any errors, including details, <br />dimensions, and materials; <br />' 3. As approving departures from details furnished by the Engineer, except as <br />otherwise provided herein. <br />' C. If the drawings or schedule as submitted describe variations per subparagraph (1.05.C), <br />and show a departure from the Contract requirements which Engineers finds to be in the <br />interest of the Owner and to be minor as not to involve a change in the Contract Price or <br />time for performance, the Engineer may return the reviewed drawings without noting an <br />exception. <br />H. When the Shop Drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />further changes therein except upon written instructions from the Engineer. <br />I. No partial submittals will be reviewed. Submittals not complete will be returned to the <br />Contractor, and will not be considered "Rejected" until resubmitted. <br />1 12/04 01340 -3 04 -4801 <br />D. When reviewed by the Engineer, each of the Shop Drawings will be identified as having <br />received such review being so stamped and dated. Shop Drawings stamped "REJECTED" <br />and with required corrections shown will be returned to the Contractor for correction and <br />' <br />re- submittal. <br />E. Re- submittals will be handled in the same manner as the first submittals. On resubmittals, <br />the Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, <br />to revisions other than the corrections requested by the Engineer on previous submissions. <br />The Contractor shall make any corrections required by the Engineer. <br />F. If the Contractor considers any correction indicated on the drawings to constitute a change <br />to the Contract Drawings or Specifications, the Contractor shall give written notice thereof <br />to the Engineer. <br />G. The Engineer will review a submittal /resubmittal a maximum of three (3) times after <br />which cost of review will be borne by the Contractor. The cost of engineering shall be <br />equal to the Engineer's charges to the Owner under the terms of the Engineer's agreement <br />with the Owner. <br />H. When the Shop Drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />further changes therein except upon written instructions from the Engineer. <br />I. No partial submittals will be reviewed. Submittals not complete will be returned to the <br />Contractor, and will not be considered "Rejected" until resubmitted. <br />1 12/04 01340 -3 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.