Laserfiche WebLink
I . Include only those sheets which are pertinent to the specific product. <br />2. Annotate each sheet to: <br />a. Clearly identify specific product or part installed. <br />b. Clearly identify data applicable to installation. <br />C. Delete references to inapplicable information. <br />C. Drawings: <br />1. Supplement product date with drawings as necessary to clearly illustrate: <br />a. Relations of component parts of equipment and systems. <br />b. Control and flow diagrams. <br />2. Coordinate drawings with information in Project Record Documents to assure <br />correct illustration of completed installation. <br />3. Do not use Project Record Documents as maintenance drawing. <br />D. Written text, as required to supplement product date for the particular installation: <br />1. Organize in consistent format under separate headings for different procedures. <br />2. Provide logical sequence of instructions of each procedure. <br />E. Copy of each warranty, bond and service contract issued: <br />1. Provide information sheet for Owner's personnel, give: <br />a. Proper procedures in event of failure. <br />b. Instances which might affect validity of warranties or bonds. <br />1.06 MANUAL FOR MATERIALS AND FINISHES <br />A. Submit five copies of complete manual in final form. <br />B. Content; for architectural products, applied materials and finishes: <br />1. Manufacturer's data, giving full information on products. <br />a. Catalog number, size, composition. <br />b. Color and texture designations. <br />C. Information required for re- ordering special- manufactured products. <br />12/04 01730 -3 04 -4801 <br />