My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
material, to prevent free water appearing on surface during or subsequent to compaction <br />operations. <br />Remove and replace, or scarify and air dry, soil material that is too wet to permit <br />compaction to specified density. <br />2. Moisture content of soil shall be within 2% of the optimum. <br />3. Soil material that has been removed because it is too wet to permit compaction, <br />but is otherwise satisfactory may be stockpiled or spread and allowed to dry. <br />Assist drying by discing harrowing or pulverizing until moisture content is <br />reduced to satisfactory value. <br />C. Place fill material in layers not more than 12- inches loose depth for material compacted by <br />hand - operated tampers. Use manually operated sled -type vibratory compactors next to <br />structures and confined areas not accessible to heavy mechanical compaction equipment. <br />D. If the Engineer shall determine that added moisture is required, water shall be applied by <br />sprinkler tanks or other sprinkler systems, which will insure uniform distribution of the <br />water over the area to be treated, distribution of the water over the area to be treated, and <br />give complete and accurate control of the amount of water to be used. If too much water <br />is added, the area shall be permitted to dry before compaction is continued. <br />E. The Contractor shall supply all hose, piping, valves, sprinklers, pumps, sprinkler tanks, <br />hauling equipment, and all other materials and equipment necessary to place the water in <br />the fill in the manner specified. <br />3.03 BACKFILL AND FILL <br />A. Place specified soil material in layers to required subgrade elevations: <br />In excavations, use satisfactory excavated or borrow material. <br />2. Under grassed areas, use satisfactory excavated or borrow material. <br />3. Under walks and pavements, use subbase material, or satisfactory excavated or <br />borrow material, or combination of both. Place shoulders along edges of subbase <br />course to prevent lateral movement with satisfactory excavated or borrow <br />material. <br />4. Under steps, use subbase material. <br />5. Under building slabs, use drainage fill material. <br />6. Under piping and conduit, use subbase material where subbase is indicated under <br />piping or conduit; shape to fit bottom 90 degrees of cylinder. <br />1 12/04 02200 -4 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.