My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. For Shrubs and Groundcovers: <br />(1) Depth: <br />' (a) 2- and 3- gallon plant material shall receive a minimum <br />of 2" of planting soil mixture beneath the root ball. <br />(b) Plant materials sized 1 gallon or less, or materials <br />' planted 24 inches O.C. or less shall receive a full 12 <br />inches of amended planting soil mix tilled to a minimum <br />depth of 12 inches. <br />' NOTE: All annuals beds shall receive a full 6 inches of <br />amended planting soil mix tilled to a minimum depth of <br />' 6 inches. <br />(c) For plants not requiring soil mix the entire bed shall be <br />tilled by mechanical means to a depth of 12 inches. <br />(2) Width or Diameter: <br />(a) All 2- or 3- gallon material shall be placed within a <br />minimum 13 -1/2 inch planting hole, and backflled with <br />the specified planting soil mix. <br />(b) All plant material sized 1 gallon or less, or material <br />planted 24 inches O.C. or less shall receive complete <br />' bed amending. That is excavation of existing soil to a <br />minimum of 12 inches <br />(Note: 6 inches for all annual beds) below finished soil <br />elevation, backfilling with a minimum 3 inches of <br />planting soil mix, and then tilling with all required <br />' amendments to a depth of not less than 12 inches. <br />(Note: 6 inches for all annual beds. All areas to be <br />' amended in such a manner shall be highlighted on <br />contractor's record drawings. <br />Bring all beds and pits to smooth, even <br />' surface conforming to established grades after full <br />settlement has occurred. <br />NOTE: Amending of and quantities of planting soil mixes <br />as outlined above contingent with existing soil <br />conditions. <br />' B. Planting Beds: <br />t1. Planting beds to a depth of 12 inch topsoil mixture. <br />2. Bring beds to smooth, even surface conforming to established grades after full <br />tsettlement has occurred. <br />3. Use specified planting soil to form watering berms around the plants. <br />1 11/04 02490 -8 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.