Laserfiche WebLink
GRAND TOTAL GENERAL $ N c� 5 3-7 6, 06 <br />LC <br />12/04 00300 -2 04 -4801 <br />Golden Shores Entrance Wall <br />UNIT PRICE BID SCHEDULE <br />Item <br />Estimated <br />No. <br />Description <br />Quantity Unit Unit Price <br />Estimated Amount <br />I. <br />GENERAL <br />1 <br />Furnish and Install eight -foot (8') high Pre -Cast <br />Concrete Barrier Wall including coping and <br />caps. <br />517 LF $ <br />2 <br />Furnish and Install coping on existing barrier <br />5 0 0 <br />wall <br />920 LF $ <br />$ <br />3 <br />Remove and dispose of chain -link fence <br />51.7 LF 3 ° <br />0 <br />1 <br />SUBTOTAL GENERAL <br />$ <br />$ <br />3 <br />Mobilization and Demobilization of all <br />�� <br />equipment and personnel (10% of Subtotal) <br />1 LS $ <br />$ <br />4 <br />Having examined the place of the work and all <br />matters referred to in the Instructions to Bidders <br />and the Contract Documents prepared by <br />Calvin- Giordano and Associates, Inc., the <br />Engineer for the above referenced project, we, <br />the undersigned, hereby offer to enter into a <br />Contract to perform the work of the base <br />contract for the Lump Sum Price which <br />includes the entire project as shown on the <br />plans and described in the specifications. <br />1 LS $ <br />$ <br />GRAND TOTAL GENERAL $ N c� 5 3-7 6, 06 <br />LC <br />12/04 00300 -2 04 -4801 <br />