Laserfiche WebLink
4. Material shall be proportioned by volume rather than weight. <br />5. Site mixing will not be acceptable. <br />6. Sand shall be free of silt and sludge. <br />7. Mixture shall be free of rocks greater than one -half inch (1 /2 ") inch in size, limbs, roots and <br />other deleterious matter. <br />8. The CONSULTANT reserves the right to reject topsoil utilized at any time during the <br />execution of Work that does not meet specification. <br />B. Topsoil: For sod areas, use a weed and rock free mixture of 80 (eighty) percent fresh water sand <br />(medium to coarse grade) and 20 (twenty) percent inland glades muck thoroughly mixed with a <br />commercial shredder/blender or equivalent. <br />1. Material shall be proportioned by volume rather than weight. <br />2. Site mixing will not be acceptable. <br />3. Sand shall be free of silt and sludge. <br />4. Mixture shall be free of rocks greater than 'h inch in size, limbs, roots and other deleterious <br />matter. <br />5. The Consultant reserves the right to reject topsoil utilized at any time during the execution <br />of Work that does not meet specification. <br />C. Topsoil: For seasonal color, use a weed and rock free mixture of soilmix #3 with the following <br />additives: 50% florida peat, 30% pine bark, 20% hardwood pines, 5% sand, #2 talstar, #1 micro mix, <br />#2 (6 -6 -6), #5 actino -grow and a 6.5 ph by Florida Potting Soils Inc. or approved equal (1- 800 -683- <br />7700). <br />D. Fertilizer used for planting backfill admixture shall be 21 Gram Agriform planting tablets used at a <br />rate recommended by the manufacturer, unless otherwise specified herein. Include Terra -sorb super <br />absorbent polymer in backfill. Follow manufacturer's recommendations for amount. <br />E. Backfill for Coconut Palm and Date Palm Planting: Clean, salt and weed free, sharp sand. Material <br />from salt or brackish water will not be acceptable. <br />F. Water: The CONTRACTOR shall be responsible for water supply up through final acceptance of the <br />Work. <br />G. Tree Guying: Guying shall be double strand, 12 gauge galvanized steel wire; minimum 3/4 inch, fiber <br />bearing 2 ply, rubber garden hose; pressure treated, 2 inch x 4 inch x 1 foot (deadman) Southern <br />Yellow Pine free of knots, rot or other weakening characteristics; 3 inch galvanized steel turnbuckles; <br />and plastic flagging. <br />(See details on plans). <br />H. Peat: Shall be Spaghnum peat moss for horticultural use. <br />I. Mulch: Shall be shredded Red Mulch, Grade B. <br />Bracing: Palms shall be braced using the following items: (4) 2x4x2' -0" pressure - treated Southern <br />Yellow Pine bracing pads; (4) 2x4 pressure- treated Southern Yellow Pine wood braces; (5) 2x4x10" <br />wood battens; hi- carbon steel banding; (5) layers of burlap wrapping. <br />K. Anti- transparent: "Dowax ", "Wilt -Pruf', or equivalent. <br />L. St. Augustine Floratam Sod: <br />02900 -3 <br />