Laserfiche WebLink
After sod is in place it shall be top dressed with sufficient sharp, clean sand, free of weeds <br />or weed seeds, to fill all voids remaining and thoroughly watered to wash the top dressing <br />into the sodded surface. The completed sodded surface shall be true to finish grade indicated <br />on the plans, even and firm at all points. Contractor shall keep new sod properly watered <br />until final acceptance. <br />Protect sodded areas against trespassing and damage of any kind for the duration of <br />maintenance period. <br />4. Sodded areas shall be planted a minimum of one month prior to final subgrade. <br />3.07 CONSTRUCTION REVIEW: <br />A. In addition to other progress construction reviews, the CONTRACTOR shall schedule and facilitate <br />the following subtrade related reviews, giving the CONSULTANT at least 48 hours before notice. <br />1. Review of proposed tree pit locations, as represented by staking. <br />2. Review, upon delivery, of plant materials at the site to verify species, vigor, size, condition, <br />shape, quantity, in compliance with specifications and drawings. <br />3. Review of tree pit excavation and fine subgrade. <br />4. The CONSULTANT shall have the right to review and hand select the Medjool Date Palms <br />at a holding facility in the State of Florida prior to delivery to job site. Hand selection shall <br />be performed at the discretion of the CONSULTANT. <br />5. Review of all backfilling for palm and tree pits as well as the placement of the soil blanket. <br />6. Review of Work and materials after completion of planting. This review shall be scheduled <br />sufficiently in advance and in cooperation with the CONSULTANT so that it may be <br />conducted within 48 (forty- eight) hours after completion of planting. <br />Review after a 30 -day (thirty) period of maintenance, upon written request by the <br />CONTRACTOR. Request shall be received at least five days before anticipated date of <br />review. <br />Review for final acceptance. <br />3.08 MAINTENANCE <br />A. General: The CONTRACTOR shall maintain all planting, starting at the time of planting and <br />continuing until all planting is complete and accepted by the CONSULTANT. <br />B. Work Included: <br />Maintenance shall include all mowing, watering, weeding, fertilizing, cultivating, spraying, <br />adjustment of guying, staking and pruning necessary to keep plant materials in a healthy <br />vigorous growing condition and keep planted areas neat and attractive. <br />2. Provide all equipment and means for proper application of water to those planted areas not <br />1.'11 • <br />