Laserfiche WebLink
PART 3 - EXECUTION <br />3.01 PREPARATION <br />A. All new installation shall be laid out by the contractor in accordance with the construction <br />plans. <br />3.02 INSTALLATION <br />A. Fence posts shall be set in accordance with the spacings shown in Table 2, plus or minus <br />1/2 ", depending on the nominal span specified. <br />Span 6 Nominal (73 -1/4 Rail) !8 'Nominal (92 Rail) <br />Post Size 2- 1/2 "3„ <br />Post Settings t `� O.C. <br />�76 -3/4" ;77 -1/4" 95 -1/2" 96" <br />.............. ............ ._ ........... ...... ... ......:._: :.... 3 .._. .,..:: .: ..... .... ......:_.:�................. .. ....: :........... <br />Table 2 — Post Spacing Requirements <br />Gate posts shall be spaced according to the gate openings specified in the construction <br />plans. The "Earthwork" and "Concrete" sections of this specification shall govern post <br />base material requirements. Aegis P1usTM panels shall be attached to posts using <br />mechanically fastened panel brackets supplied by the manufacturer. <br />3.03 CLEANING <br />A. The contractor shall clean the jobsite of excess materials; post -hole excavations shall be <br />scattered uniformly away from posts. <br />END OF SECTION <br />06/05 02444 -4 03- 4138.13 <br />