My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fence Masters #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Responses
>
Fence Masters #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 10:42:16 AM
Creation date
1/18/2011 4:48:45 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 DESCRIPTION <br />A. Concrete shall be of Portland cement, ASTM C -94, fine aggregate, coarse aggregate, water <br />' and admixtures as specified and shall be ready- mixed, or transit -mixed concrete. All <br />constituents, including admixture, shall be batched at the central batch plant. <br />' B. Reinforced concrete shall conform to ACI Specification 318 -89 or latest revision. <br />C. Field testing and inspection services required will be provided by the Contractor. Cost of <br />such work, except as specifically stated otherwise, will be paid for by the Contractor. <br />Methods of test will comply in detail with the latest applicable ASTM Methods of Testing. <br />D. Samples of constituents and of concrete as placed will be subjected to laboratory tests. <br />' Materials incorporated in the work shall conform to approved samples. <br />E. Under special circumstances, the Engineer may allow minor deviations from the material <br />requirements specified, provided the resulting concrete quality is not adversely affected or <br />provided a suitable adjustment in cement content is made to compensate for such <br />deviations without cost to the Owner. <br />1.05 SUBMITTALS <br />A. Submit, as provided in the General Conditions and Section 01340, shop drawings showing <br />placement of forms, form joints, major inserts and blockouts. <br />1.06 QUALITY ASSURANCE <br />' A. The actual acceptance of aggregates and development of mix proportions to produce <br />concrete conforming to the specific requirements shall be determined by means of prior <br />laboratory tests made by the Concrete Supplier or the Contractor at his expense with the <br />constituents to be used on the work. <br />B. The Concrete Supplier shall submit through the Contractor to the Engineer for approval the <br />concrete mix he intends to use, designed within the limits of these specifications, listing the <br />brand of cement, source and results of tests of aggregates and admixtures not later than 14 <br />days prior to the beginning of placing concrete. <br />1 C. The limiting strengths, water- cement ratios and cement factors as shown on (Table A) shall <br />apply. Maximum water - cement ( # / #) for structures shall be 0.53 by weight. <br />' <br />TABLE A <br />Minimum <br />Maximum Net <br />Minimum <br />Comp. Str. <br />Water Content <br />Cement Factor <br />' <br />psi at 28 days <br />gals /100 lbs* <br />100 Ibs /cu yd ** <br />2500 <br />7.4 <br />4.3 <br />' <br />3000 <br />7.0 <br />4.8 <br />3500 <br />6.4 <br />5.64 <br />4000 <br />5.85 <br />5.64 <br />*Maximum; decrease if possible. This represents total water in mix at time of mixing, <br />including free water on aggregates, and water in admixture solution. <br />' * *Minimum; increase as necessary to meet other requirements. These cement factors apply <br />to "controlled" concrete subject to specific inspection. <br />06/05 03300 -2 03- 4138.B <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.