My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No.1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Addendum No.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 12:46:07 PM
Creation date
1/18/2011 4:55:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the number of units completed) or, in the event there is no schedule of values, as provided in the <br />General Requirements. <br />5.1.1. Prior to Substantial Completion, progress payments will be made in an amount <br />equal to the percentage indicated below, but, in each case, less the aggregate of payments <br />previously made and less such amounts as ENGINEER shall determine, or OWNER may <br />withhold, in accordance with paragraph 14.02 of the General Conditions. <br />90 % of Work completed (with the balance being retainage). If Work has been <br />50% completed as determined by ENGINEER, and if the character and progress <br />of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on <br />recommendation of ENGINEER, may determine that as long as the character and <br />progress of the Work remain satisfactory to them, there will be no additional <br />retainage on account of Work completed, in which case the remaining progress <br />payments prior to Substantial Completion will be in an amount equal to 100% of <br />the Work completed. <br />90 % (with the balance being retainage) of materials and equipment not <br />incorporated in the Work (but delivered, suitably stored and accompanied by <br />documentation satisfactory to OWNER as provided in paragraph 14.02 of the <br />General Conditions and within Section 9 -6.5 partial payments as provided in <br />FDOT Standard Specifications for Road and Bridge Construction. <br />5.1.2. When circumstances beyond the CONTRACTORS control arise (as determined by <br />the OWNER) the OWNER may allow the total payment to the CONTRACTOR to <br />increase to 98% of the contract price (with the balance being retainage), less such <br />amounts as ENGINEER shall determine, only after receipt of the final as- builts and upon <br />substantial completion of the project and in accordance with Paragraph 14.02 of the <br />General Conditions. <br />5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with <br />paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price <br />as recommended by ENGINEER as provided in said paragraph 14.07. <br />Article 6. INTEREST. (Not Applicable) <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />7.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the <br />Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents <br />including "technical data." <br />7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of the <br />Work. <br />06/05 00500 -3 03- 4138.13 S I <br />
The URL can be used to link to this page
Your browser does not support the video tag.