Laserfiche WebLink
PART 3 - EXECUTION <br />3.01 PREPARATION <br />A. All new installation shall be laid out by the contractor in accordance with the construction <br />plans. <br />3.02 INSTALLATION <br />A. Fence posts shall be set in accordance with the spacings shown in Table 2, plus or minus <br />1/2 ", depending on the nominal span specified. <br />+Span 6' Nominal (73 1/4" Rail) 8' Nominal (92" Rail) <br />..... ._ ........ __ _..... . ..., . . <br />Post Size 12 -1/2" �311 ;3" <br />_ -- -- -- <br />Post <br />. .......Settings f % O.C. 76 -3/4" 77 -1/4" 95 -1/2" <br />..... . .. .... 96" <br />i_ <br />Table 2 — Post Spacing Requirements <br />Gate posts shall be spaced according to the gate openings specified in the construction <br />plans. The "Earthwork" and "Concrete" sections of this specification shall govern post <br />base material requirements. Aegis PIusTM panels shall be attached to posts using <br />mechanically fastened panel brackets supplied by the manufacturer. <br />3.03 CLEANING <br />A. The contractor shall clean the jobsite of excess materials; post -hole excavations shall be <br />scattered uniformly away from posts. <br />END OF SECTION <br />06/05 02444 -4 03-4138.B <br />