My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HPB Reso 2016-16
SIBFL
>
City Clerk
>
Resolutions
>
Historic Preservation Board
>
2016
>
HPB Reso 2016-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 3:06:11 PM
Creation date
1/5/2017 3:02:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fence Construction: WC)yeh= W\ \ be-, UOSA-f-lxc" <br />Walls: ) O W ob S Il l t I � bt- CAYI4gkC.6-ri <br />C. Overall Description of the Project (Please explain the chronology of the work <br />involved and describe all new construction excavation, demolition, and relocation <br />that will be required. Describe how the building or property will be used upon <br />completion. (Use the back of this sheet or another sheet if needed): <br />The area immediately adjacent to and between the existing patios will be excavated for the placement of <br />pilings and forming of grade beams and new slabs. Once the flat concrete work is complete <br />prefabricated steel columns will be installed to support the decorative wooden trellis. The steel columns <br />will be covered with round decorative concrete columns. The area will be used for outdoor meals and <br />entertaining. <br />Signature of the Applicant: <br />Signature 9f th 7O�,wif <br />V4 <br />NOR",. ( <br />Date: V `� `-'y%� <br />from above): <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.