Laserfiche WebLink
City of Sunny Isles Beach <br />RFQ No. 06- 12 -02: Professional General Engineer Services <br />• Page 4 of 5 <br />The experience of our proposed staff relevant to the scope of work for this project is shown below. As shown on this <br />table, the CES Team consists of a core staff with the experience and exposure to complete this assignment cost - <br />effectively and on schedule. <br />r� <br />L J <br />The CES Team has extensive experience with the planning and design of similar projects that match the required <br />expertise in the RFP scope of work. The following table summarizes several of the projects that were performed by <br />our key staff being proposed for the above - referenced projects. <br />CES CONSULTANTS, INC. <br />OWNER VALUE <br />PROJECT FEATIJRES <br />Miami -Dade County $1,500 <br />Pump stations, gravity sewer lines and force mains remedial action <br />Water & Sewer <br />plans preparation <br />Department <br />Miami -Dade County <br />$550,000 <br />Pump Station Improvement Program — planning design, permitting and <br />Water & Sewer <br />8 <br />program management services for the design of over 600 pump stations <br />Department <br />and over 250 miles of gravity and force main lines. <br />Miami -Dade County <br />$4,000,000 <br />°c <br />Public Works <br />roadway reconstruction, bridge design, ADA compliant design services <br />Department <br />for sidewalks and bus stops, drainage improvements, and construction <br />W <br />engineering and inspection throughout Miami -Dade County. <br />y <br />X <br />W <br />P <br />W <br />C <br />y <br />U <br />m <br />c <br />v <br />X <br />o <br />w <br />Q <br />bA <br />a� <br />w <br />k <br />W <br />7S <br />cn <br />3 <br />c�0 <br />� <br />� <br />N <br />U <br />h <br />•� <br />❑ <br />0 <br />,� <br />a <br />Employee <br />i <br />J <br />a <br />n <br />1x <br />.°a <br />U <br />a <br />U <br />cn <br />w <br />Rudy M. Ortiz, P.E. <br />CES <br />20 <br />_� <br />_� <br />a <br />a <br />Fernando Miralles, Ph.D, <br />CES <br />15 <br />P.E. <br />Joseph C. Chan, P.E. <br />CES <br />25 <br />_D <br />a <br />_D <br />.lose A. Caraballo <br />CES <br />5 <br />_� <br />a <br />� <br />�� <br />a <br />� <br />Z <br />_Z* <br />Srikanth V. Cajula, E.J. <br />CES <br />2 <br />� <br />_a <br />, <br />_� <br />_� <br />.a <br />Jose Acosta, P.E. <br />MLI <br />8 <br />Karen Lynch, PSNI <br />RS &H 1 <br />18 <br />The CES Team has extensive experience with the planning and design of similar projects that match the required <br />expertise in the RFP scope of work. The following table summarizes several of the projects that were performed by <br />our key staff being proposed for the above - referenced projects. <br />CES CONSULTANTS, INC. <br />OWNER VALUE <br />PROJECT FEATIJRES <br />Miami -Dade County $1,500 <br />Pump stations, gravity sewer lines and force mains remedial action <br />Water & Sewer <br />plans preparation <br />Department <br />Miami -Dade County <br />$550,000 <br />Pump Station Improvement Program — planning design, permitting and <br />Water & Sewer <br />program management services for the design of over 600 pump stations <br />Department <br />and over 250 miles of gravity and force main lines. <br />Miami -Dade County <br />$4,000,000 <br />Master Consultant for Miami -Dade County providing services for <br />Public Works <br />roadway reconstruction, bridge design, ADA compliant design services <br />Department <br />for sidewalks and bus stops, drainage improvements, and construction <br />engineering and inspection throughout Miami -Dade County. <br />CES CONSULTANTS, INC. <br />