Laserfiche WebLink
Civil Works, Inc. <br />W I Miami - Ft. Lauderdale - Orlando <br />t A WBE /DBE firm 305 -448 -5955 954 - 344 -6568 407 - 339 -0040 <br />www.civilworks.com cwi @civilworks.com <br />' ALEJANDRO B. HERNANDEZ, E.I. GENERAL CIVIL <br />EDUCATION B.S. Civil Engineering/National Autonomous University of Nicaragua/] 981. <br />E.I. State of Florida Certificate, 2001. <br />PE/EIT review courses. <br />AutoCad 2000, Microstation J, Microsoft Excel, Microsoft Word <br />PROFESSIONAL REGISTRATION Florida E.I. No. 1100007187 <br />EXPERIENCE: <br />Mr. Hernandez has more than twenty seven years in Commercial and Residential development <br />' projects, water and sewer improvements, storm drainage design, GIS mapping for noise analysis, <br />and production of AutoCad. Generated drawing plans and profiles, compile and plot existing <br />utilities to properly place drainage structures avoiding any conflict. Cost estimating, project <br />tinspection and field reports. <br />GENERAL CIVIL: <br />Belen Drainage Improvements - DERM - Participated in the design and preparation of plans for 250 acre <br />' drainage basin included French Drains and a new pump station connected to the Tamiami Canal <br />in Miami -Dade County. <br />' Alvarez Engineers, Inc. <br />Highway and site development engineering, with emphasis in roadway and drainage design, <br />computer modeling, CAD, computation of quantities, cost estimating and project inspection. <br />■ State Road 826 and 36 th Street Interchange - Collaborated in the drainage design for the interchange <br />at State Road 826 and NW 36 th Street, included pipe networks, exfiltration trenches, <br />' conveyance swales and retention ponds in Miami -Dade County. <br />State Road 5 (US I)- Participated in the rehabilitation design and preparation of plans for 2.2 miles of 4 -lane <br />' road of State Road 5 (US 1), included resurfacing, drainage design and plan production, in Martin <br />County <br />Agricultural and Industrial Complex (TIMAL). <br />Supervised and site inspected for construction of a macro industrial irrigation system and its <br />infrastructure, which included 72 miles of open canal, 24 pump stations, 30 bridges and 650 miles <br />' all weather road, and the structural plans review calculations, cost estimations for the entire project <br />' Nicaraguan Institute of Water and Sewer. <br />Supervised and site inspected for construction of utility projects consisting of improvement of the <br />potable water network collection, conduction, storage, and distribution. Also included, the <br />' expansion and improvement of the sewer systems in several cities. <br />j' Civil Works, Inc. 10 NW 42nd Avenue, Suite 200, Miami,FL 33126 Ph: 305 -448 -5955 Fax: 305 -448 -5466 <br />