My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHEN & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
CHEN & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:37:03 AM
Creation date
1/24/2011 4:34:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consult.
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
&ASSOCIATES <br />Civil and Environmental Engineers <br />FIRM EXPERIENCE - CONTINUED <br />Project Name: CENTRAL NEIGHBORHOOD IMPROVEMENT PROJECT <br />Location: BROWARD COUNTY, FL <br />Description: This is the second of three neighborhood infrastructure improvement projects <br />carried out by Broward County in the unincorporated areas. The project <br />included the improvement of the drainage, water, sanitary sewer, and roadway <br />systems. Chen and Associates was selected to be the design engineer for one <br />third of the project sites, including the Franklin Park, Washington Park, St. <br />George West, and St. George East neighborhood areas. Chen and Associates <br />was also part of a team of engineers that completed the Basis of Design <br />Report (BODR), and served as the project reviewer that made <br />recommendations resulting in substantial savings to the project's budget. The <br />construction for the Franklin Park, Washington Park, St. George West, and St. <br />George East is complete. <br />Client: Broward County Water and Wastewater Services (BCWWS) <br />Pat MacGregor <br />2555 West Copans Road <br />Pompano Beach, FL 33069 <br />(954) 831 -0904 <br />Project Fee: $4,800,000 <br />Construction Budget: $27,000,000 (Completed under budget) <br />Completion Date: December 2004 <br />"Providing quality, responsive and professional service to clients, peers and the public for 20 years" <br />
The URL can be used to link to this page
Your browser does not support the video tag.