My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-03-01) General Engineering Services
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2011 2:30:44 PM
Creation date
1/25/2011 2:23:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Engineering Svcs. for Government Infrastructure
Bid No. (xx-xx-xx)
07-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />consultants must submit five (5) complete copies of the submittal that <br />include, at a minimum, the following information: <br /> <br />1. Name, address and company, including, but not limited to, a <br />business overview, financial state of the business, annual revenue <br />for past two years, and names and addresses of persons having <br />financial interest in the firm. If sub-consultants are used, the bid <br />must specify the type of contractual agreement between all firms <br />and include certificate(s) of authorization to offer professional <br />services through the Florida State Board of Engineers, including <br />the prime and supporting firms. <br />2. A list of all projects (including governmental projects) completed or <br />in process for the past five years, and a corresponding list of client <br />references with contact names and telephone numbers. <br />3. Proof of authorization to transact business in Florida from the <br />Florida Secretary of State, from the prime as well as supporting <br />firms. <br />4. Appropriate current Federal 254 and 255 forms showing the firm <br />data and supporting the firm's ability to perform each category of <br />work required. <br />5. The name, title, qualifications, experience, and all contact <br />information of the proposed project manager. <br />6. A listing of the proposed personnel to be assigned to the project, <br />listing their qualifications and experience. <br />7. A listing of all permits expected to be necessary, and the issuing <br />agencies that will be involved. <br />8. A general schedule showing the mileposts for design, and <br />estimates on the construction timetable. <br />9. An estimate of the total construction costs (not includinq desiqn <br />fees) for the finish project as designed by the firm. <br />10. The general breakdown of person hours for the completed design <br />of the project (including the time necessary to obtain of all <br />permits). <br /> <br />Submittals will be received by the City Clerk until 10:00 a.m.. Wednesday. <br />April 18. 2007. at the Sunny Isles Beach Government Center, Fourth Floor <br />Conference Room, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. <br />Submittals will be opened publicly and read aloud at this time. Submittals <br />may be rejected after this time. The City is under no obligation to return the <br />submittals. The City reserves the right to reject all submittals and to waive <br />any defects. <br /> <br />Page 6 01'9 <br />RFQ 07-03-0 I Engineering Srvs Bridge Revised (Addendum. I ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.