Laserfiche WebLink
<br />. <br /> <br />New Millennium's expertise includes major bridge design <br />services. On the SR H26 Ramp A S'egmen/al Bridge project <br />our firm provided engineering services for the widening of <br />a single segmental concrete box ramp bridge. The structure <br />consisted of multiple spans in the plus 200 n range and is <br />on a 1000 Il curve. Our finn was responsible for complete <br />torsional and reaction analysis for the bridge in conjunction <br />with temporary supports for the widening of the segmental <br />bridge structure. This project required special tie down <br />supports that were designed by New Millennium to take <br />uplill reactions at low reactive piers. In addition, New <br />Millennium designed all temporary sheet piling and other <br />structural appurtenances for the successful widening of the <br />bridge. <br /> <br />. <br /> <br />On this project. New Millennium Design Consultants <br />(NM) will act as lead consultant on the project team. Our <br />responsibilities will include project management. bridge <br />design. roadway design. signing & pavement markings, <br />drainage design. specifications. utility coordination, post <br />design services. bid administration (procurement), <br />construction management and inspection (eEl) and quality <br />control. <br /> <br />For this particular project NM has teamed with T. Y. Lin <br />International I H.J. Ross. GeosoL Inc., Manuel G. Vera & <br />Associates. Inc. and Media Relations Group, LLC. Each <br />team member brings extensive experience in their discipline <br />to the team. <br /> <br />T. Y. Lin International I H.J. Ross will provide additional <br />structural design expertise. roadway, environmental <br />permitting. landscape architecture and lighting design <br />services. <br /> <br />. <br /> <br />T. Y. Lin International I I-LJ. Ross (TYLI-I-1JR) is a world- <br />class bridge engineering consulting firm with major design <br />capability and is distinguished as a recognized world leader <br />in bridge design highlighted by consistent innovations in <br />design and construction of transportation structures. With <br />over 58 years of experience in South Florida (under its <br />former name of J-/..J. Ross Associate.,), the design of <br />pedestrian bridge structures has been a significant area of <br />focus for TYLI-I-1JR. They have completed over 30 <br /> <br /> <br />SR-826 Ramp A Segmental Bridge <br />Miami-Dade County, Florida <br /> <br /> <br />Dagu Pedestrian Bridge, Foshan, China <br /> <br /> <br />Proposed Parkside Pedestrian Bridge, <br />Washington, DC <br /> <br />Request for Qualifications No, 07-03-01 <br /> <br />Page 2 of 15 <br />