Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Schedule - Following is the anticipated milestones for the design, permitting and construction <br />schedule: <br /> <br />Data Gathering <br />PD&E Report <br />30% Construction Documents <br />60% Construction Documents <br />90% Construction Documents <br />Final Construction Documents <br />Permitting <br />Construction <br /> <br />- 45 Days <br />- 90 Days <br />- 45 Days <br />- 45 Days <br />- 60 Days <br />- 30 Days <br />- 6 to 12 months <br />- 15 months <br /> <br />Project Budget - Due to the uncertainties in the potential alignment and configuration of the bridge <br />structure, estimates will vary widely. In our project discussion, we recommend a three span structure <br />with a moderate amount of skew to meet the anticipated easement. Based on this configuration, these <br />are approximate estimates of the projected construction costs: <br /> <br />Bridge Structure <br />Roadway Approaches <br />Earthwork/Embankment <br />Drainage Improvements <br />Aesthetic upgrades <br />Landscaping Budget <br />Lighting <br />Total <br /> <br />- $1,800,000 <br />- $ 400,000 <br />- $ 50,000 <br />- $ 150,000 <br />- $ 250,000 <br />- $ 150,000 <br />- $ 150.000 <br />- $2,950,000 <br /> <br />These figures do not include the boardwalk project, permit fees, environmental mitigation, or design <br />fees. <br /> <br />Design Hours - These estimates represent an approximate outline of the work effort involved in the <br />development if the project <br /> <br />Project Research <br />Environmental Coordination and Permitting <br />Preliminary Study <br />Structural Design <br />Roadway Design <br />Aesthetic Upgrades <br />Landscape Architecture <br />Lighting Design <br />Project Management <br /> <br />- 100 hours <br />- 450 hours <br />- 400 hours <br />-1400 hours <br />- 400 hours <br />- 200 hours <br />- 120 hours <br />- 100 hours <br />- 300 hours <br /> <br />These estimates do not include any data gathering by sub-consultants such as surveying and <br />geotechnical studies. <br /> <br />Page 7 of 7 <br />