Laserfiche WebLink
<br />I <br />I <br />I <br /> <br />Macombs Dam Bridge <br /> <br />I <br /> <br />I <br /> <br /> <br />. I , tIT <br />-- - - -----~ <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />n.... <br />: ~~ . I <br />. .~ ;: <br /> <br /> <br />I <br /> <br />Project Location: <br />Completion Date: <br />Project Cost <br />Project Owner: <br /> <br />New York, New York <br />2001 (Design) <br />$70,000,000 <br />Mr. Jay Patel <br />Deputy Chief Engineer <br />NYC Dept. of Transportation <br />2 Rector Street <br />New York, NY 10006 <br /> <br />.-- '~I <br />.;':-1 . <br /> <br />~.::: '.: <br /> <br /> <br />: ~~- <br /> <br />, ": .- <br />,-:J ". <br /> <br />~:.--' __'_~F_ <br /> <br />- '7:'J-'- <br /> <br />I <br /> <br />I,.j;;- <br /> <br />rr <br /> <br />, I <br /> <br />Award: Excellence in Design - New York City Art Commission <br /> <br />I <br />I <br />I <br /> <br />H2L2 was commissioned by Modjeski & Masters, engineering prime. for the reconstruction of the <br />Macombs Dam Bridge. The bridge, New York's third oldest major span, is a major vehicular <br />crossing between Harlem and the Bronx as well as a pedestrian route to and from Yankee Stadium. <br /> <br />H2L2's scope of work included a new control house and access stairways, railings, protective <br />fencing, curb safety barriers, roadway lighting, historic statuary and a fountain. H2L2's overriding <br />goal was to gain approval from the NYC Art Commission for the design of these items. For each <br />item, H2L2 analyzed the existing and historic conditions and made subsequent design <br />recommendations for preservation, renovation or new construction. <br /> <br />I <br /> <br />In cooperation with Modjeski & Masters, H2L2 worked with a diverse group of interests and public <br />agencies including NYCDOT, NYSDOT, the NYC Art Commission, and the NYC Landmarks <br />Commission. At every step of the design process, H2L2 was challenged to balance the historic <br />character of the bridge with pragmatic demands for enhanced operational efficiency and <br />pedestrian/user safety. H2L2 received the Award for Excellence in Design from the NYC Art <br />Commission. <br /> <br />I <br /> <br />I <br /> <br />H2L2 <br /> <br />I <br /> <br />ARCHITECTURE - INTERIOR DESIGN - PLANNING - INFRASTRUCTURE <br />