My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Add the following sentence to Paragraph 13.07 .A.: <br /> <br />"Specific and special warranties specified in the Contract Documents are in <br />addition to, and not in lieu of, the contractors general warranty. <br />CONTRACTOR shall not be relieved of general warranty obligations by the <br />specification of specific products or procedures." <br /> <br />13.09. In the first sentence of the paragraph OWNER, MAY CORRECT DEFECTIVE <br />WORK: c <br /> <br />Change the first line from ": <br /> <br />If Contractor fails within a reasonable time after written notice of Engineer..." t <br /> <br />To read: <br /> <br />If Contractor fails within ten (10) calendar days after written notice of <br />Engineer... " <br /> <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br /> <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days <br />before each progress payment is scheduled (but not more often than once a month), ..." <br />to read: <br /> <br />"By no later than the first day of the month, ...". <br /> <br />Following Paragraph Add 14.02.A.34 add:: <br /> <br />4. "An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each <br />subsequent application thereafter. For each application for payment <br />(excluding Application No.1) the Contractor shall submit with the <br />application Partial Releases of Liens for all Notice to Owners that have <br />been received for the project by the Owner and Engineer". <br />5. With each Application for Payment, the Contractor shall submit <br />supporting records and other evidence, in a form and amount <br />acceptable to the City and the Engineer, to demonstrate the expenses <br />incurred and the Work performed. This shall include, but not be <br />limited to documentation related to the purchase of Owner-Provided <br />Material and the reduction in the Contract Sum as a result of such <br />expenditures. <br />6. Each application for Payment shall be based on the most recent <br />schedule of values submitted by Contractor in accordance with the <br />Contract Documents. The schedule of values shall allocate the entire <br />guaranteed maximum Contract Price among the various portions of <br />the Work, except that the Contractor's Fee shall be shown as a <br />separate item. The schedule of values shall be prepared in such form <br /> <br />March 2007 <br /> <br />00800-8 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.