Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item No. 2711- 33- Skip Traffic Stripe (White) - per meter. <br />Item No. 711- 34- Skip Traffic Stripe (Yellow) - per foot. <br />Item No. 2711- 34- Skip Traffic Stripe (Yellow) - per meter. <br />Item No. 711- 35- Solid Traffic Stripe (White) - per foot. <br />Item No. 2711- 35- Solid Traffic Stripe (White) - per meter. <br />Item No. 711- 36- Solid Traffic Stripe (Yellow) - per foot. <br />Item No. 2711- 36- Solid Traffic Stripe (Yellow) - per meter. <br />Item No. 711- 37- Solid Traffic Stripe (White) - per net mile. <br />Item No. 2711- 37- Solid Traffic Stripe (White) - per net kilometer. <br />Item No. 711- 38- Solid Traffic Stripe (Yellow) - per net mile. <br />Item No. 2711- 38- Solid Traffic Stripe (Yellow) - per net kilometer. <br />Item No. 710- 21- Skip Traffic Stripe (White/Black) - per gross mile. <br />Item No. 2710- 21- Skip Traffic Stripe (White/Black) - per gross kilometer. <br />Item No. 710- 22- Skip Traffic Stripe (Yellow) - per gross mile. <br />Item No. 2710- 22- Skip Traffic Stripe (Yellow) - per gross kilometer. <br />Item No. 710- 23- Solid Traffic Stripe (White/Black) - per net mile. <br />Item No. 2710- 23- Solid Traffic Stripe (White/Black) - per net kilometer. <br />Item No. 710- 24- Solid Traffic Stripe (Yellow) - per net mile. <br />Item No. 2710- 24- Solid Traffic Stripe (Yellow) - per net kilometer. <br />Item No. 710- 25- Solid Traffic Stripe (White/Black) - per foot. <br />Item No. 2710- 25- Solid Traffic Stripe (White/Black) - per meter. <br />Item No. 710- 26- Solid Traffic Stripe (Yellow) - per foot. <br />Item No. 2710- 26- Solid Traffic Stripe (Yellow) - per meter. <br />Item No. 710- 6- Directional Arrows, Painted - each. <br />Item No. 2710- 6- Directional Arrows, Painted - each. <br />Item No. 710- 7- Pavement Messages, Painted - each. <br />Item No. 2710- 7- Pavement Messages, Painted - each. <br /> <br />104 PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER <br />POLLUTION. <br />(REV 5-24-04) {FA 7-13-04} {1-05} <br /> <br />ARTICLE 104-5 (pages 123-125) is deleted and the following substituted: <br /> <br />104-5 Preconstruction Requirements. <br />At the Preconstruction Conference, provide to the Department an Erosion Control <br />Plan meeting the requirements or special conditions of all permits authorizing project <br />construction. If no permits are required or the approved permits do not contain special <br />conditions or specifically address erosion and water pollution, the project Erosion Control <br />Plan will be governed by 7-1.1, 7-2.2, 7-8.1, 7-8.2, and Section 104. <br />When a DEP generic permit is issued, the Contractor's Erosion Control Plan shall be <br />prepared to accompany the Department's Stormwater Pollution Prevention Plan (SWPPP). <br />Ensure the Erosion Control Plan includes procedures to control off-site tracking of soil by <br />vehicles and construction equipment and a procedure for cleanup and reporting of <br />non-storm water discharges, such as contaminated groundwater or accidental spills. Do <br />not begin any soil disturbing activities until Department approval of the Contractor's <br />Erosion Control Plan, including required signed certification statements. <br /> <br />March 2007 <br /> <br />01 000-1 8 <br /> <br />03-4122.0 <br />