My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />I <br /> <br />Contractor's negligence or carelessness or, in the case of temporary erosion control <br />features, failure by the Contractor to install permanent erosion control features as <br />scheduled, the Contractor shall replace such erosion control features at no expense to the <br />Department. If reconstruction of permanent or temporary erosion control features is <br />necessary due to factors beyond the control of the Contractor, the Department will pay for <br />replacement under the appropriate Contract pay item or items. <br />Inspect all erosion control features at least once every seven calendar days <br />and within 24 hours of the end of a storm of 0.50 inches [12 mm] or greater. Maintain all <br />erosion control features as required in the Stormwater Pollution Prevention Plan, <br />Contractor's Erosion Control plan and as specified in the State of Florida Department of <br />Environmental Protection Generic Permit for Stormwater Discharge from Large and Small <br />Construction Activities. <br /> <br />SUBARTICLE 104-7.2 (Page 129) is deleted and the following substituted: <br /> <br />104-7.2 Mowing: The Engineer may direct mowing of areas within the limits of the <br />project, in addition to and apart from those areas specified in Section 580. Mow these <br />designated areas within seven days of receiving such order. Remove and properly dispose <br />of all litter and debris prior to the mowing operation. Use conventional and specialized <br />equipment along with hand labor to mow the entire area including slopes, wet areas, <br />intersections, overpasses and around all appurtenances. Mow all areas to obtain a uniform <br />height of 6 inches [150 mm], unless directed otherwise by the Engineer. <br /> <br />ARTICLE 104-9 (Page 129) is deleted and the following substituted: <br /> <br />104-9 Method of Measurement. <br />When separate items for temporary erosion control features are included in the <br />Contract, the quantities to be paid for will be: (1) the areas, in square yards [square <br />meters], of Artificial Coverings; (2) the area, in acres [hectares], of Mowing; including <br />litter, debris removal and disposal, equipment, labor, materials and incidentals; (3) the <br />volume, in cubic yards [cubic meters], of Sandbagging, measured in accordance with <br />530-4.1; (4) the length, in feet [meters], of Slope Drains (Temporary), measured along the <br />surface of the work constructed; (5) the number of Sediment Basins acceptably <br />constructed; (6) the number of Sediment Basin Cleanouts acceptably accomplished; (7) the <br />number of hay or straw bales; (8) the length, in feet [meters], of Floating Turbidity Barrier; <br />(9) the length, in feet [meters], of Staked Turbidity Barrier; (10) the length, in feet <br />[meters], of Staked Silt Fence; (11) seeding materials in accordance with Section 570 and <br />(12) the number of Rock Bags acceptably placed. <br />The quantity of floating turbidity barrier, relocated turbidity barrier, staked turbidity <br />barrier, and staked silt fence to be paid for will be the total length, in feet [meters], <br />furnished, installed, and accepted at a new location, regardless of whether materials are <br />new or used or relocated from a previous installation on the project. <br /> <br />March 2007 <br /> <br />01 000- 21 <br /> <br />03-4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.