My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Materials Office will perform Resolution testing. The material will be sampled and tested in <br />accordance with AASHTO T 88. <br />The Engineer will compare the Resolution Test results with the <br />Quality Control test results. If the Resolution test matches the Quality Control <br />classification, the Engineer will use the Quality Control classification for material <br />acceptance purposes. If the Resolution Test result does not match the Contractor's Quality <br />Control classification, the Verification Test result will be used for material acceptance <br />purposes. <br /> <br />125 EXCAVATION FOR STRUCTURES AND PIPE. <br />(REV 6-25-04) (FA 8-3-04) (7-05) <br /> <br />SUBARTICLE 125-4.4 (Pages 168 and 169) is expanded by the following: <br /> <br />For pipe trenches utilizing trench boxes, ensure that the trench box used is <br />of sufficient width to permit thorough tamping of bedding material under and around the <br />pipes as specified in 125-8.1.6. <br />Do not disturb the installed pipe and its embedment when moving trench <br />boxes. Move the trench box carefully to avoid excavated wall displacement or damage. As <br />the trench box is moved, fill any voids left by the trench box and continuously place and <br />compact the backfill material adjacent to and all along the side of the trench box walls to <br />fill any voids created by the trench box. <br /> <br />SUBARTICLE 125-8.1.1 (Page 169) is deleted and the following substituted: <br /> <br />125-8.1.1 General: Backfill in the Dry whenever normal dewatering <br />equipment and methods can accomplish the needed dewatering. A LOT is defined as one <br />lift of backfill material placement, not to exceed 500 feet [150 m] in length or a single run <br />of pipe connecting two successive structures, whichever is less. Backfill around structures <br />compacted separately from the pipe will be considered as separate LOTs. Backfill on each <br />side of the pipe for the first lift will be considered a separate LOT. Backfill on opposite <br />sides of the pipe for the remaining lifts will be considered separate LOTs, unless the same <br />compactive effort is applied. For multiple phase backfill, a LOT shall not extend beyond the <br />limits of the phase. <br />When placing backfill within a trench box each lift of backfill is <br />considered a LOT. Placement of backfill within trench box limits will be considered a <br />complete operation before trench box is moved for next backfill operation. When the <br />trench box is moved for next backfill operation this will start new LOTs for each lift. <br /> <br />SUBARTICLE 125-8.1.6 (Page 170). The first paragraph is deleted and the following <br />substituted: <br /> <br />125-8.1.6 Placement and Compaction: Place the material in horizontal layers <br />not exceeding 6 inches [150 mm] compacted thickness, in depth above water level, behind <br />abutments, wingwalls and end bents or end rest piers, under the haunches of the pipes <br />and around box culverts and all structures including pipe culverts. When the backfill <br />material is deposited in water, compact as specified in 125-8.2.5 and 125-8.3.4. <br /> <br />March 2007 <br /> <br />01000-35 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.