My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1____ <br /> <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />125-10.2 Density Testing: When a Verification or Independent Verification density <br />test fails the Acceptance Criteria, retest the site within a 5 feet (1.5 meter) radius and the <br />following actions will be taken: <br />1. If the Quality Control retest meets the Acceptance Criteria and compares <br />favorably with the Verification or Independent Verification test, the Engineer will accept <br />those LOTs. <br />2. If the Quality Control retest does not meet the Acceptance Criteria and <br />compares favorably with the Verification or Independent Verification test, rework and <br />retest the LOT. The Engineer will re-verify those LOTs. <br />3. If the Quality Control retest and the Verification or Independent <br />Verification test do not compare favorably, complete a new equipment-comparison analysis <br />as defined in 120-10.1.2. Once acceptable comparison is achieved, retest the LOTs. The <br />Engineer will perform new verification testing. Acceptance testing will not begin on a new <br />LOT until the Contractor has a gauge that meets the comparison requirements. <br />125-10.3 Soil Classification: Meet the requirements of 120-10.4.3. <br /> <br />160 ACCEPTANCE PROGRAM. <br />(REV 6-25-04) (FA 6-29-04) (1-05) <br /> <br />ARTICLE 160-7 (Pages 184-187) is deleted and the following substituted: <br /> <br />160-7 Acceptance Program. <br />160-7.1 General Requirements: Meet the requirements of 120-10.1, except use <br />160-7.2 instead of 120-10.2. <br />160-7.2 Acceptance Criteria: <br />160-7.2.1 Bearing Value Requirements: <br />160-7.2.1.1 General: Within the entire limits of the width and depth <br />of the areas to be stabilized, obtain the required minimum bearing value for each LOT. For <br />any area where the bearing value obtained is deficient from the value indicated in the <br />plans, in excess of the tolerances established herein, spread and mix additional stabilizing <br />material in accordance with 160-5.3. Perform this reprocessing for the full width of the <br />roadway being stabilized and longitudinally for a distance of 50 feet [15 m] beyond the <br />limits of the area in which the bearing value is deficient. <br />Determine the quantity of additional stabilizing material to be <br />used in reprocessing. <br />160-7.2.1.2 Undertolerances in Bearing Value Requirements: Use the <br />following undertolerances from the specified bearing value, as based on tests performed on <br />samples obtained after completing mixing operations: <br /> <br />Specified Bearing Value <br />LBR 40 <br />LBR 35 <br />LBR 30 (and under) <br /> <br />Tolerance <br />5.0 <br />4.0 <br />2.5 <br /> <br />The following unsoaked bearing value requirement IS based on tests <br />performed on samples obtained after completing mixing operations: <br /> <br />March 2007 <br /> <br />01000-37 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.