My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,----- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />234-5 Acceptance of the Mixture. <br />234-5.1 General: Meet the requirements of 334-5 with the following modifications: <br />234-5.2 Acceptance Testing Exceptions: Density determinations will not be required <br />on base widening strips 5 feet [1.5 m] or less in width, nor on the initial layer of base <br />placed on a soil subgrade. In these situations compact the base in accordance with the <br />rolling procedure (equipment and pattern) submitted as part of the Quality Control Plan and <br />as approved by the Engineer. Use the permissible variations from longitudinal and <br />transverse grades as specified in 200-7. The pay factor for LOTs where there are areas not <br />requiring density testing will be prorated based on a pay factor of 1.00 for the tonnage of <br />material in areas not requiring density testing and the actual pay factor for the tonnage of <br />material in areas requiring density. <br /> <br />234-6 Plant, Methods and Equipment. <br />Meet requirements of Section 320, with the following modifications: <br />234-6.1 Paving Equipment: A motor grader may be used to spread the first course <br />of multiple course bases when the subgrade will not support the use of a mechanical <br />spreader. The Engineer will not require mechanical spreading and finishing equipment for <br />the construction of base widening strips less than 6 feet [1 .8 m] in width. <br />234-6.2 Compaction Equipment: In areas where standard rollers cannot be <br />accommodated, vibratory rollers supplemented with trucks, motor graders, or other <br />compaction equipment approved by the Engineer may be used. <br /> <br />234-7 Construction Requirements. <br />234-7.1 General: Meet the General Construction Requirements of Section 330, with <br />the following modifications: <br />234-7.1.1 Temperature Limitations: Spread the mixture only when the air <br />temperature is at least 400F [40C] and rising. Do not place the material on frozen <br />subgrade. <br />234-7.1.2 Tack Coat: Unless otherwise authorized by the Engineer, apply a <br />tack coat between successive layers of base material. <br />234-7.1.3 Thickness of Layers: Construct each course in layers not to <br />exceed 3 inches [75 mm] compacted thickness. <br /> <br />234-8 Thickness Requirements. <br />234-8.1 General: When the Department pays for the pavement on a square yard <br />[square meter] basis, the Engineer will determine the thickness of the asphalt base based <br />upon the spread rate of the material. The minimum spread rate for the total thickness shall <br />be established from the plan thickness in the following manner: 43.3 Ibs/sy multiplied by <br />the maximum specific gravity of the mix (as indicated on the mix design) for everyone <br />inch [9.28 kg/m2 multiplied by the specific gravity for every 10 mm] of desired thickness, <br />or as determined by the Engineer. The weight of the mixture shall be determined as <br />provided in 320-2.2 (including the provisions for automatic recordation system). <br />The spread rate for each individual layer shall be established by the Engineer. <br />The minimum layer spread rate shall be 43.3 Ibs/sy multiplied by the maximum specific <br />gravity (Gmm) of the mix (as indicated on the mix design) for everyone inch [9.28 kg/m2 <br />multiplied by the specific gravity for every 10 mm] of desired thickness. <br />234-8.2 Spread Rate Tolerance: Control the average spread rate on a daily basis to <br />within :t 5 % of the target spread rate for the individual layer(s) established by the Engineer. <br /> <br />March 2007 <br /> <br />01000-45 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.