My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />the Quality Control split sample for gradation, asphalt binder content and volumetrics in <br />accordance with 334-5.1.1. Complete all Quality Control testing within one working day <br />from the time the samples were obtained. <br />334-5.3.2 Roadway Sampling and Testing Requirements: Obtain five 6 inch <br />[150 mm] diameter roadway cores within 24 hours of placement at random locations as <br />directed by the Engineer within each sublot. Test these Quality Control samples for density <br />in accordance with 334-5.1.1. The Gmm used for the density evaluation will be based on <br />the Quality Control test result for the corresponding sublot. <br />On coarse mixes when the average density for an Initial Production <br />sublot is less than 93.00 percent of Gmm, or an individual core density is less than 91.00 <br />percent of Gmm, cut five 6 inch [150 mm] diameter roadway cores (at locations determined <br />by the Engineer) and have them evaluated for permeability in accordance with FM 5-565 <br />by a laboratory as approved by the Engineer. If approved by the Engineer, the original cores <br />cut for density testing purposes may be used to evaluate permeability. <br />334-5.3.3 Verification of Initial Production LOT: For Verification purposes <br />the Engineer will test a minimum of one split sample as described in 334-5.1.1 from the <br />Initial Production LOT at the completion of the LOT. Results of the testing and analysis for <br />the LOT will be made available to the Contractor within one working day from when the <br />LOT is completed. <br />The Verification test results will be compared with the corresponding <br />Quality Control test results based on the between-laboratory precision values shown in <br />Table 334-5. <br />If all of the specified mix characteristics compare favorably, then the <br />LOT will be accepted, with payment based on the Quality Control results for the LOT. <br />If any of the results do not compare favorably, then the split <br />Resolution samples from the LOT will be sent to the Resolution laboratory for testing, as <br />described in 334-5.6. <br />334-5.3.4 Acceptance of Initial Production LOT: The Initial Production LOT <br />shall be considered a single LOT and will receive a Composite Pay Factor as determined in <br />334-8, based on results of the verified Quality Control tests, or as determined by the <br />Resolution System. <br />334-5.4 Quality Control Sampling and Testing: Obtain all samples randomly as <br />directed by the Engineer. <br />Should the Engineer determine that the Quality Control requirements are not <br />being met or that unsatisfactory results are being obtained, or should any instances of <br />falsification of test data occur, approval of the Contractor's Quality Control Plan will be <br />suspended and production will be stopped. <br />334-5.4.1 Lost or Missing Verification/Resolution Samples: In the event that <br />any of the Verification and/or Resolution samples that are in the custody of the Contractor <br />are lost, damaged, destroyed, or are otherwise unavailable for testing, the minimum <br />possible pay factor for each quality characteristic as described in 334-8.2 will be applied to <br />the entire LOT in question, unless called for otherwise by the Engineer. Specifically, if the <br />LOT in question has more than two sublots, the pay factor for each quality characteristic <br />will be 0.55. If the LOT has two or less sublots, the pay factor for each quality <br />characteristic will be 0.80. In either event, the material in question will also be evaluated in <br />accordance with 334-5.9.5. <br />If any of the Verification and/or Resolution samples that are in the <br />custody of the Department are lost, damaged, destroyed or are otherwise unavailable for <br /> <br />March 2007 <br /> <br />01000-61 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.