My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />Table 334-4 <br />Master Production Range <br />Characteristic Tolerance (1) <br />Asphalt Binder Content ( percent) Target :t 0.55 <br />Passing No.8 [2.36 mm] Sieve ( percent) Target :t 5.50 <br />Passing No. 200 [75 Jim] Sieve ( percent) Target :t 1.50 <br />Air Voids ( percent) Coarse Graded 2.00 - 6.00 <br />Air Voids ( percent) Fine Graded 2.30 - 6.00 <br />Density, percent Gmm (2) <br />Coarse Graded (minimum) 93.00 <br />Fine Graded (minimum) 90.00 <br />(1) Tolerances for sample size of n = 1 from the verified mix design <br />(2) Based on an average of 5 randomly located cores <br /> <br />334-5.5 Verification Testing: In order to determine the validity of the Contractor's <br />Quality Control test results prior to their use in the Acceptance decision, the Engineer will <br />run verification tests. <br />334-5.5.1 Plant Testing: At the completion of each LOT, the Engineer will <br />test a minimum of one Verification split sample randomly selected from the LOT. Results of <br />the testing and analysis for the LOT will be made available to the Contractor within one <br />working day from the time the LOT is completed. Verification samples shall be reheated at <br />the target roadway compaction temperature for 1 1/2 hours, reduced to the appropriate <br />testing size, and conditioned and tested as described in 334-5.1.1. <br />The Verification test results will be compared with the Quality Control <br />test results based on the between-laboratory precision values shown in Table 334-5. <br /> <br />Table 334-5 <br />Between-Laboratory Precision Values <br />Property Maximum Difference <br />Gmm 0.016 <br />Gmb 0.022 <br />Pb 0.44 percent <br />P-200 FM 1-T 030 (Fiqure 2) <br />P-8 FM 1-T 030 (Figure 2) <br /> <br />If all of the specified mix characteristics compare favorably, then the <br />LOT will be accepted, with payment based on the Contractor's Quality Control test data <br />for the LOT. <br />If any of the results do not compare favorably, then the Resolution <br />samples from the LOT will be sent to the Resolution laboratory for testing, as described in <br />334-5.6. <br />334-5.5.2 Roadway Testing: At the completion of each LOT, the Engineer <br />will determine the density (Gmb) of each core (previously tested by Quality Control) as <br />described in 334-5.1.1 from one randomly selected sublot from the LOT. Results of the <br />testing and analysis for the LOT will be made available to the Contractor within one <br />working day from the time the LOT is completed. <br />The individual Verification test results will be compared with <br /> <br />March 2007 <br /> <br />01000-63 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.