My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 338-1 <br />Category 1 Condition Survey <br /> <br />Threshold Values fo <br />o <br />Type of Survey Each LOT (0.1 Mile) Remedial Work <br />per Lane. <br />(1) Rutting: Rut depth to be determined by Laser Profiler in accordance with the Flexible <br />Pavement Condition Survey Handbook. For any LOT that cannot be surveyed by Laser <br />Profiler, rut depth to be determined manually in accordance with the Flexible Pavement <br />Condition Survey Handbook, except the number of readings per LOT will be one every 50 <br />eet (Minimum of three measurements), using a 0.30 inch threshold value. <br />(21 Remedial Work for Rutting: The Contractor may propose removal and replacement of <br />less than the full depth of all layers by preparation and submittal of a signed and sealed <br />engineering analysis report, demonstrating the actual extent of the distressed area(s). <br />Remedial work must be performed in accordance with Table 338-1 unless the Engineer <br />approves the proposal. <br />(31 Ride: Ride Number (RN) to be established by Laser Profiler in accordance with FM 5-549. <br />As a condition of project final acceptance in accordance with 5-11, correct all deficiencies <br />in accordance with acceptance criteria for pavement smoothness in accordance with 330- <br />12.6. <br />141 Cracking: Beginning and ending of 1/8 inch cracking will be determined as the average <br />of three measurements taken at one foot intervals. The longitudinal construction joint at <br />he lane line will not be considered as a crack. <br />(51 Remedial Work for Cracking: The Contractor may propose removal and replacement of <br />less than the full depth of all layers by preparation and submittal of a signed and sealed <br />engineering analysis report, demonstrating the actual extent of the distressed area(s). <br />Remedial work must be performed in accordance with Table 338-1 unless the Engineer <br />approves the proposal. <br />(61 Raveling, Delamination, Pot holes, Slippage: As defined and determined by the Enginee <br />in accordance with the examples displayed at the following URL: <br />www.dot.state.fl.us/specificationsoffice/pavement.htm <br />(7) Patched Areas: At the time of final survey, patched areas must be performing to the <br />satisfaction of the Engineer. If the Engineer determines patched areas are not performing <br />satisfactorily, remove and replace the distressed area(s) to the full distressed depth, and to <br />a minimum surface area of 150% of each distressed area. <br />(8) Bleeding: Bleeding to be determined as defined and determined by the Engineer in <br />accordance with the examples displayed at the following URL: <br />www.dot.state.fl.us/specificationsoffice/pavement.htm <br /> <br />Type <br />Distress <br /> <br />338-5.3 Category 2 Pavement: For purposes of this Specification, "Category 2 <br />Pavement" is defined as mainline roadways, access roads and frontage roads with a design <br />speed less than 50 mph; parking areas; rest areas; weigh stations; and agricultural <br />inspection stations. <br />Threshold values and associated remedial work for Category 2 Value Added <br />Asphalt Pavement are specified in Table 338-2. <br /> <br />TABLE 338-2 <br />Category 2 Condition Survey <br /> <br />March 2007 <br /> <br />01 000-84 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.