My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />! I <br />I <br />I <br />I <br />I <br />I <br />I <br />!I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the extent required, the Statewide Disputes Review Board will render a final decision by <br />majority vote. <br />Remedial work will not apply if anyone of the following factors is found to <br />be beyond the scope of the Contract: <br />a. Determination that the pavement thickness design is deficient. The <br />Department will make available a copy of the original pavement thickness design package <br />and design traffic report to the Responsible Party upon request. <br />b. Determination that the Accumulated ESALs (Number of 18 Kip <br />Equivalent Single Axle Loads in the design lane) have increased by 25 % or more over the <br />Accumulated ESALs used by the Department for design purposes for the warranty period. <br />In calculating ESALs, the Average Annual Daily Traffic (AADT) will be obtained from the <br />Department's traffic count data and the T24 (Percent Heavy Trucks during a 24 hour <br />period) will be obtained from the Department's traffic classification survey data. <br />c. Determination that the deficiency was due to the failure of the <br />existing underlying layers that were not part of the Contract work. <br />d. Determination that the deficiency was the responsibility of a third <br />party or its actions, unless the third party was performing work included in the Contract. <br />If a measured distress value indicates remedial action is required per <br />Table 338-1, Table 338-2 and/or Table 338-3, the Responsible Party must begin remedial <br />work within 45 calendar days of notification by the Department or a ruling of the <br />Statewide Disputes Review Board. The Disputes Review Board will determine the allowable <br />duration for the completion of the remedial work, but not to exceed 6 months. However, <br />after each survey, if the Department determines the extent and magnitude of pavement <br />distresses in any areas will not affect the traffic safety, strength of pavement structure or <br />highway aesthetics, the Engineer, at his sole option, may defer the remedial work <br />associated with the pavement distresses. <br />In the event remedial action is necessary and forensic information is required <br />to determine the source of the distress, the Department may core and/or trench the <br />pavement. The Responsible Party will not be responsible for damages to the pavement as a <br />result of any forensic activities conducted by the Department. <br />As applicable to distress criteria for rutting, ride and cracking for Category 1 <br />and Category 2 pavements, when two LOTs requiring remedial action are not separated by <br />three or more LOTs that otherwise require no remedial action, the remedial work shall be <br />required for the total length of all such contiguous LOTs, including the intermediate LOTs <br />otherwise requiring no remedial action. <br />Additionally, for Category 1 and Category 2 pavements, where the limits of <br />remedial action are defined as 150% of the distressed area, and where such areas of <br />remedial action required due to rutting, raveling, cracking, slippage or bleeding are not <br />separated by 1,000 feet, the remedial work will be required for the entire area contiguous <br />to the distressed areas, including intermediate areas otherwise requiring no remedial action. <br />The Responsible Party has the first option to perform all remedial work that <br />is determined by the Department to be their responsibility. If, in the opinion of the <br />Engineer, the problem poses an immediate danger to the traveling public and the <br />Responsible Party cannot begin remedial work within 72 hours of written notification, the <br />Engineer has the authority to have the remedial work performed by other forces. The <br />Responsible Party is responsible for all incurred costs of the work performed by other <br />forces should the problem (remedial work) be determined to be the responsibility of the <br /> <br />March 2007 <br /> <br />01000-86 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.