My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />plan. Furnish a copy of all temperature readings to the Engineer as they are determined, <br />and a final report within 3-days of completion of monitoring of each element. <br />If the 350F [200C] differential has been exceeded, take immediate action, as <br />directed by the Specialty Engineer who must be available for immediate consultation at any <br />time, to retard further growth of the temperature differential. Use a Specialty Engineer to <br />revise the previously accepted plan to ensure compliance on future placements. Do not <br />place any mass concrete until the Engineer has accepted the mass concrete plan(s). When <br />mass concrete temperature differentials are exceeded provide all analyses and test results <br />deemed necessary by the Engineer for determining the structural integrity and durability of <br />the mass concrete element, to the satisfaction of the Engineer. The Department will make <br />no compensation, either monetary or time, for the analyses or tests or any impacts upon <br />the project. <br /> <br />346-4 Composition of Concrete. <br />346-4.1 Master Proportion Table: Proportion the materials used to produce the <br />various classes of concrete in accordance with Table 3: <br /> <br />TABLE 3 <br /> Minimum Total Cementitious * Maximum Water <br />Class of Concrete Materials Content Ib/yd3 [kg/m3] Cementitious Materials Ratio <br /> Ib/lb [kg/kg] <br />I (Pavement) 508 [300] 0.50 <br />I (Special) 508 [300] 0.50 <br />II 564 [335] 0.49 <br />II (Bridge Deck) 611 [365] 0.44 <br />III 611 [365] 0.44 <br />"' (Seal) 611 [365] 0.52 <br />IV 658 [390] 0.41 <br />IV (Drilled Shaft) 658 [390] 0.41 <br />V (Special) 752 [445] 0.37* * <br />V 752 [445] 0.37* * <br />VI 752 [445] 0.37* * <br />*The calculation of the water to cementitious materials ratio (w/cm) is based on the total <br />cementitious material including silica fume, slag, fly ash or metakaolin. <br />* *When the use of silica fume or meta kaolin is required as a pozzolan, the maximum water <br />cementitious material ratio will be 0.35. <br /> <br />346-4.2 Chloride Content Limits for Concrete Construction: <br />346-4.2.1 General: Use the following maximum chloride content limits for <br />the concrete application shown: <br /> <br />March 2007 <br /> <br />01000-95 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.