My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />Test results obtained at the frequency provided above represent the <br />chloride content of all concrete placed subsequent to the preceding test for the <br />determination of chloride content. <br />346-4.2.3 Certification: Determine the chloride content, and certify the test <br />results of chloride determinations to the Department. Include in the certification all <br />pertinent data required by the Department. The Department will require properly executed <br />certifications showing the chloride content within the required limits for acceptance of all <br />concrete produced in accordance with these Specifications. <br />346-4.2.4 Control Level for Corrective Action: If the test results indicate that <br />the chloride level is greater than the following limits, suspend concrete production until <br />implementing corrective measures acceptable to the Engineer. <br />(1) Chloride content of 0.65 Ib/yd3 [0.39 kg/m3] or greater for <br />reinforced concrete that does not require Type II cement plus slag or pozzolan(s). <br />(2) Chloride content of 0.35 Ib/yd3 [0.21 kg/m3] or greater for <br />prestressed concrete and all applications that require Type II cement with slag or <br />pozzolan(s) . <br />The Engineer will reject the concrete exceeding the maximum <br />allowable chloride content limits shown in 346-4.2.1. <br /> <br />346-5 Sampling and Testing Methods. <br />Perform concrete sampling and testing in accordance with the following methods: <br /> <br />TABLE 5 <br />Description Method <br />Slump of Hydraulic Cement Concrete ASTM C 143 [ASTM C 143M] <br />Air Content of Freshly Mixed Concrete by the Pressure ASTM C 231 <br />Method * <br />Air Content of Freshly Mixed Concrete by the ASTM C 173 [ASTM C 173M] <br />Volumetric Method * <br />Making and Curing Test Specimens in the Field ASTM C 31 [ASTM C 31 M] <br />Compressive Strength of Cylindrical Concrete ASTM C 39 [ASTM C 39M] <br />Specimens * * <br />Obtaining and Testing Drilled Core and Sawed Beams 0 ASTM C 42 [ASTM C 42M] <br />Concrete <br />Early Sampling of Fresh Concrete During the Initial FM 5-501 <br />Placement <br />Low Levels of Chloride in Concrete and Raw Materials FM 5-516 <br />Density (Unit Weight) , Yield and Air Content ASTM C 138 [ASTM C 138M] <br />(Gravimetric) of Concrete <br />Temperature of Freshly Mixed Portland Cement ASTM C 1064 [ASTM C 1064M] <br />Concrete <br />Sampling Freshly Mixed Concrete ASTM C 1 72 <br />*Use the same type of meter for QC tests as the Department uses for Verification testing. <br />When using pressure type meters, use an aggregate correction factor determined by the <br />concrete producer for each mix desi!=Jn to be tested. Record and certify test results for <br /> <br />March 2007 <br /> <br />01000-97 <br /> <br />03-4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.