My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Williams Paving Co.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Responses
>
Williams Paving Co.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 4:04:05 PM
Creation date
1/27/2011 3:36:49 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SR826 / SIBlvd.
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APR-30-2007 MON 03:21 PM CALVIN GIORDANO <br /> <br />FAX NO. 9549218807 <br /> <br />P. 04/05 <br /> <br />I I <br /> <br /> Subtotal of 0200 Roadway rn5, c,-,q :p; <br /> . <br />II. Summary of 0300 Signing <br /> 38 Sign Single Post 41.00 AS ;27S".OO Jl ~7S'. 00 <br /> 39 Sign Existing (Romoval) 22.00 AS (pO. 00 I ~7D .00 <br /> 40 Sign Existing (Relocate) 7.00 AS '75'. 00 -12ZS.00 <br /> 41 Ratm-Reflectlve Pavement Markers 192.00 EA -</'75 q /2 -DO <br /> 42 Painted Pavement Marking (Final Surface) 1.00 LS IVJO/~'OO lei S/~.Oa <br /> Subtotal of 0300 Signing 1~.;J<l7. 6i? <br />III. Summary of 0400 Lightlng <br /> 43 light Pole Foundation 21 EA 1225" .00 cJ~ 7;1S, (){) <br /> 44 Conduit (F & I Underground PVC SCH 80) 2" 3030 LF Co'7~ 2D ,/~1..'50 <br /> 45 Pull l30x (F & I) at Light Pole 21 EA 5'10. 00 II~D.DO <br /> 46 Pull Box (F & I) 2 EA (1)(00.00 ~=3W. CO <br /> 47 Conductors (F & I) (Insulated) (No.6) 10255 LF ~'7~ ~<64S"fo ZS <br /> 48 Lighting Pole Complete (Single Arm Shoulder Mount) 21 EA '1,170-00 2 e#, S~.~O <br /> 49 Pole Cable Distribution System 21 EA /$SS.{)Q ?fi,9SS-oC <br /> 50 Service Rack Assembly 1 EA :JCjZ').DO 592S". Q) <br /> Subtotal of 0400 lighting [37 (p) 1'f3 .'7 S- <br />IV. Summary of 0500 SIgnalization <br /> 51 Conduit (Furnish & Install) (Under Pavement) 1,705,00 LF :35.00 59LP7S .(1::) <br /> 62 Cable (Signal) (Furnish & Install) 1.00 PI ~.Oo J btdJ.[D <br /> 53 Pull & Junction Boxes (F & I) (Pull Box) 20.00 EA ~\o~.{)b /z :;t)(). DO <br /> 64 Electrical Power Service (Overhead) 1.00 AS -1<150 .00 ICjSf).()O <br /> 65 Electrical Service Wire 225.00 LF {o . <fS /5'"(1/ . zs <br /> 56 M/Arm (F&II HL) (SGL Arm WID Lum) pt Arm (85) 1.00 EA ~DI'2.5.DO 4D12S.ca <br /> 67 Signal Traffic I F&I) (3 Sect 1 Way) (Std) 3.00 AS -' ()Lt~ . CD 3/~S-.oO <br /> 58 Signal Pedestrian (Neon International Sym Low Watt 2.00 AS <(;~S . 00 /7~. 00 <br /> 59 Signal Head AUxiliaries (Back Plates 3 Sect) 3.00 EA I().OO d-70.00 <br /> 60 Signal Head Auxiliaries (Aluminum Pedestal) 1,00 EA t:)tJO. OD qOO.OO <br /> 61 Loop Assembly (F&I) (Type A) 4.00 AS jd7S.QO 5100.00 <br /> 62 Detector Pedest (F&I) (Det Sts Pole or Cabinet MTD) 2.00 EA ;;no. ()O 1sl/0. ()O <br /> 63 Cntl Assem Act SS (F&I) 170 Pre(none) 1.00 AS as"~/o.{)O ~ ~/O.OD <br /> 64 System AuxiliEtres (Telemetry Transceiver) 1,00 EA dliQS.ro d/(PSCD <br /> 66 System Auxiliares (Universal Adapter) 1.00 EA g.~-5 .CD cQll '5.00 <br /> 66 System Auxjfiares (Standby System Relay) 1.00 EA IV.SO <br /> / .SZ) <br /> 67 Signal Head Traffic Assembly Removal 3.00 EA SO.OO )'SO. CO <br /> March 2007 00300-3 03-4122.0. <br /> Addendum #4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.