My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />within 30 days after final inspection and plant start-up test. <br /> <br />E. Final Operation and Maintenance submittals shall be in large three ring binders <br />organized by specification Section and plainly marked per paragraph 1.04(C). <br /> <br />1.09 INSTRUCTION OF OWNER'S PERSONNEL <br /> <br />A. Prior to final inspection or acceptance, fully instruct Owner's designated <br />operating and maintenance personnel in operation, adjustment and maintenance <br />of products, equipment and systems. <br /> <br />B. Operating and maintenance manual shall constitute the basis of instruction. <br /> <br />1. Review contents of manual with personnel in full detail to explain all <br />aspects of operations and maintenance. <br /> <br />1.10 ENGINEER'S 0 & M CHECKLIST <br /> <br />A. The Engineer will review Operation and Maintenance Manuals submittals on <br />operating equipment for conformance with the requirements of this Section. The <br />review will generally be based upon the checklist presented on the following <br />pages (Table 01730) for the benefit of the Contractor and his suppliers. <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />06/07 <br /> <br />01730-7 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.