My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02200 <br /> <br />EARTHWORK <br /> <br />PART 1 - GENERAL <br /> <br />1.01 RELATED SECTIONS <br /> <br />A. Section 01010: Summary of Work <br /> <br />1.02 SECTION INCLUDES <br /> <br />A. Preparation of subgrade for building slabs, walks, and pavements. <br /> <br />B. Excavation, fill, and backfill. <br /> <br />1.03 QUALITY ASSURANCE <br /> <br />A. Perform excavation work in compliance with applicable requirements of <br />governing authorities having jurisdiction. <br /> <br />1.04 PROJECT CONDITIONS <br /> <br />A. Locate existing underground utilities in areas of work. Provide adequate means <br />of support and protection during earthwork operations. <br /> <br />B. Should uncharted, or incorrectly charted, piping or other utilities be encountered <br />during excavation, consult utility owner immediately for directions. Cooperate <br />with Owner and utility companies in keeping respective services and facilities in <br />operation. Repair damaged utilities to satisfaction of utility owner. <br /> <br />C. Do not interrupt existing utilities serving occupied facilities. <br /> <br />D. Use of Explosives: If the use of explosives is necessary for the execution of the <br />work the Contractor shall conduct his blasting operations in conformance with <br />these specifications and all applicable state and local codes and regulations. <br /> <br />E. Protect structures, utilities, sidewalks, pavements, and other facilities from <br />damage caused by settlement, lateral movement, undermining, washout and <br />other hazards created by earthwork operations. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 SOIL MATERIALS <br /> <br />A. Satisfactory Soil Materials: ASTM D2487 soil classification groups GW, GP, GM, <br />SM, SW and SP. <br /> <br />B. Unsatisfactory Soil Materials: ASTM D2487 soil classification groups GC, SC, <br />ML, MH, CL, CH, OL, OH and PT. <br /> <br />06/07 <br /> <br />02200-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.