My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.04 <br /> <br />3.05 <br /> <br />06/07 <br /> <br />4. For pipes or conduit 6 in. or larger, tanks and other work indicated to <br />receive subbase, excavate to subbase depth indicated, or, if not <br />otherwise indicated, to 6 in. below bottom of work to be supported. <br /> <br />5. Except as otherwise indicated, excavate for exterior water-bearing piping <br />so top of piping is minimum 30" below finished grade. <br /> <br />6. Grade bottoms of trenches as indicated, notching under pipe bells to <br />provide solid bearing for entire body of pipe. <br /> <br />N. Do not backfill trenches until tests and inspections have been made and <br />backfilling authorized by Engineer. <br /> <br />PIPE INTERFERENCES <br /> <br />A. The contractor shall abide by the following schedule of criteria concerning <br />interferences with other utilities. <br /> <br />1. In no case shall there be less than 0.3 feet between any two pipelines <br />and structures. <br /> <br />2. Class I Concrete Encasement: Wherever there is more than 0.3 foot, but <br />not less than 1.5 foot clearance between water mains or water services, <br />then a concrete encasement shall be provided in accordance with the <br />typical detail as shown on the Drawings. <br /> <br />3. Class 1/ Concrete Encasement: Wherever there is more than 0.3 foot, <br />but less than 1.0 foot clearance between any two pipe lines, or between <br />pipe lines and structures, then a concrete encasement shall be provided <br />in accordance with the typical detail as shown on the Drawings. <br /> <br />B. The Engineer shall have full authority to direct the placement of the various pipes <br />and structures in order to facilitate construction, expedite completion and to <br />avoid conflicts. <br /> <br />BACKFilLING <br /> <br />A. Backfilling over pipes shall begin as soon as practical after the pipe has been <br />laid, jointed, and inspected and the trench filled with suitable compacted material <br />to the mid-diameter of the pipe. <br /> <br />B. All backfilling shall be prosecuted expeditiously as work permits, but not until <br />completion of the following: <br /> <br />1. Acceptance of construction below finish grade including waterproofing <br />and perimeter insulation. <br /> <br />2. Inspection, testing, approval, and recording locations of underground <br />utilities. <br /> <br />02221-8 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.