My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02611 <br /> <br />REINFORCED CONCRETE PIPE <br /> <br />PART 1 - GENERAL <br /> <br />1.01 SCOPE OF WORK <br /> <br />A. Furnish all labor, materials, equipment and incidentals required and install in the <br />locations as shown on the drawings, the reinforced concrete pipe (R.C.P.) and <br />appurtenances as described herein. <br /> <br />1.02 RELATED WORK <br /> <br />A. Section 02221: Trenching, Bedding and Backfill for Pipe <br /> <br />1.03 DESCRIPTION OF SYSTEM <br /> <br />A. Piping shall be installed at the location shown on drawings. <br /> <br />1.04 QUALIFICATIONS <br /> <br />A. All R.C.P. and appurtenances shall be furnished by a single manufacturer who is <br />fully experienced, reputable, and qualified in the manufacture of the items to be <br />furnished. The equipment shall be designed, constructed, and installed in <br />accordance with the best practices and methods and shall comply with these <br />Specifications. <br /> <br />1.05 SUBMITTALS <br /> <br />A. Shop drawings shall be submitted to the Engineer for approval and shall include <br />dimensioning and technical specification for all piping to be furnished. <br /> <br />1.06 TOOLS <br /> <br />A. Special tools, solvents, lubricants, and caulking compounds required for normal <br />installation shall be furnished with the pipe. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />A. R.C.P. shall be in accordance with ASTM C-76-88 Class II wall B and as <br />manufactured by United States Concrete Pipe Co. or approved equal. <br /> <br />B. All pipe shall be bundled or packaged in such a manner as to provide adequate <br />protection for the ends, threaded, or flanged, during transportation from the <br />manufacturer. <br /> <br />06/07 <br /> <br />02611-1 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.