My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />II <br /> <br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02931 <br /> <br />SODDING <br /> <br />PART 1 - GENERAL <br /> <br />1.01 WORK INCLUDED <br /> <br />A. Furnish all labor, materials, equipment and incidentals required to prepare lawn <br />bed and install sodding as shown on contract drawings and as specified herein. <br /> <br />B. Area to receive sodded grass lawns within the landscape limits shown on the <br />drawings except as noted herein shall be as designated on the Drawings. <br /> <br />1.02 SUBMITTALS <br /> <br />A. Provide technical data as specified in Section 01340 for shop drawings on all <br />materials or installation procedures required under this Section. <br /> <br />B. Submit representative topsoil samples for analysis by a private laboratory to <br />determine nutrient deficiencies and outline a proper fertilization program. <br /> <br />C. Submit as provided in Section 01720 certifications required for all sodding <br />supplied. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 SOD <br /> <br />A. Sod shall be St. Augustine Floritam of firm texture having a compacted growth <br />and good root development as approved. <br /> <br />B. Sod shall be certified to meet Florida State Plant Board specifications, absolutely <br />true to varietal type, and free from weeds or other objectionable vegetation, <br />fungus, insects and disease of any kind. <br /> <br />C. Before being cut and lifted, the sod shall have been mowed 3 times with the final <br />mowing not more than a week before cutting into uniform dimensions. <br /> <br />2.02 SOIL CONDITIONERS <br /> <br />A. Fertilizer: <br /> <br />1. Fertilizer shall be a complete fertilizer, the elements of which are derived <br />from organic sources. Fertilizer shall be a standard product complying <br />with State and Federal fertilizer laws. <br />2. Percentages of nitrogen, phosphorus and potash shall be based on <br />laboratory tests on soils outlined in Paragraph 1.028 and approved by the <br />Engineer. For purpose of bidding, assume 6% nitrogen, 6% phosphorus <br />and 6% potash by weight. At least 50% of the total nitrogen shall contain <br />no less than 3% water-insoluble nitrogen. <br /> <br />06/07 <br /> <br />02931-1 <br /> <br />03--4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.