My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I D. <br />I E. <br />I <br />I F. <br />I <br />I G. <br />I <br />I <br />I <br />I <br /> H. <br />I <br />I I. <br />I <br />I <br />I J. <br />I <br />I <br />06/07 <br />I <br /> <br />When high-early-strength Portland cement is permitted, the same strength <br />requirements shall apply except that the indicated strengths shall be attained at <br />seven (7) days instead of twenty-eight (28) days. <br /> <br />If during the progress of the work it is impossible to secure concrete of the required <br />workability and strength with the materials being furnished, the Engineer may order <br />such changes in proportions or materials, or both, as may be necessary to secure <br />the desired properties. All changes so ordered shall be made at the Contractor's <br />expense. <br /> <br />If during the progress of the work the Contractor desires to use materials other <br />than those originally approved, or if the materials from the sources originally <br />approved change in characteristics, the Contractor shall, at his own expense, have <br />made new acceptance tests of aggregates and establishment of new basic <br />mixtures and submit them to the Engineer for approval. <br /> <br />Consistency of the concrete as measured by the ASTM Designation C143 shall be <br />as shown in (Table B). <br /> <br />TABLE B <br /> <br />Portion of Structure <br /> <br />Slump <br />Max.* <br /> <br />(inches) <br />Min. <br /> <br />Pavement and slabs on ground 3 2 <br />Plain footings, gravity walls, <br />slabs and beams 3 2 <br />Heavy reinforced foundation <br />walls and footings 4 2 <br />Thin reinforced walls and columns 4 2 <br />* May be increased i-inch if proper method of consolidation is used. <br /> <br />Concrete shall be of such consistency and mix composition that it can be readily <br />worked into the corners and angles of the forms and around the reinforcement, <br />inserts, and wall castings without permitting materials to segregate or free water to <br />collect on the surface, due consideration being given to the methods of placing and <br />compacting. <br /> <br />No excessively wet concrete will be permitted, and if at any time concrete of such <br />consistency beyond the limits of Table B is delivered to the job, the Engineer may <br />direct the Contractor to reject same or to add extra cement for which no additional <br />payment will be made. A supply of the approved cement shall be kept available at <br />the site for this purpose. Drivers of transit-mix trucks shall add no additional water <br />except that established for the design. Failure to comply with this requirement <br />shall be justification for rejecting the concrete. <br /> <br />The entrained air, as measured by the Pressure Method, ASTM C231, shall be as <br />shown in (Table C). <br /> <br />TABLE C <br /> <br />Nominal Maximum Size <br />of Coarse Aqqreqate(in) <br /> <br />Total Air Measured at <br />Discharqe from truck (%) <br /> <br />03300-3 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.