My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.07 <br /> <br />06/07 <br /> <br />PLACING AND COMPACTING <br /> <br />A. Unless otherwise permitted, the work begun on any day shall be completed in <br />daylight of the same day. <br /> <br />B. Concrete is not to be placed until reinforcing steel, pipes, conduits, sleeves, <br />hangers, anchors and other work required to be built into concrete have been <br />inspected and approved by the Engineer. Remove water and foreign matter from <br />forms and excavation. All soil bottom for slabs and footings shall be approved by <br />the Engineer before placing concrete. <br /> <br />C. Transport concrete from mixer to place of final deposit as rapidly as practicable by <br />methods which prevent separation of ingredients and displacement of <br />reinforcement, and which avoid re-handling. Partially hardened concrete is not to <br />be used. <br /> <br />D. "Cold joints" are to be avoided, but if they occur, are to be treated as bonded <br />construction joints. <br /> <br />E. At construction joints the surfaces of the concrete already placed, including vertical <br />and inclined surfaces, shall be thoroughly cleaned of foreign materials and <br />laitance, and weak concrete and roughened with suitable tools to expose a fresh <br />face. At least two hours before and again shortly before the new concrete is <br />deposited, the joints shall be saturated with water. After glistening water <br />disappears, the joints shall be given a thorough coating of neat cement slurry <br />mixed to the consistency of very heavy paste. The surfaces shall receive a coating <br />at least 1/8-inch thick, well scrubbed-in by means of stiff bristle brushes whenever <br />possible. New concrete shall be deposited before the neat cement dries. <br /> <br />F. Deposit concrete to maintain, until the completion of the unit, a horizontal plastic <br />surface. Vertical lifts shall not exceed 24-inches and preferably 18-inches. <br /> <br />G. Chutes for conveying concrete shall be of U-shaped designed and sized to insure <br />a continuous flow of concrete. Flat (coal) chutes shall not be employed. Chutes <br />shall be metal or metal-lined and each section shall have approximately the same <br />slope. The slope shall not be less than 25 nor more than 45 degrees from the <br />horizontal and shall be such as to prevent the segregation of the ingredients. The <br />discharge end of the chute shall be provided with a baffle plate or spout to prevent <br />segregation. If the discharge end of the chute is more than 5 feet above the <br />surface of the concrete in the forms, a spout shall be used, and the lower end <br />maintained as near the surface of deposit as practicable. When the operation is <br />intermittent, the chute shall discharge into a hopper. Chutes shall be thoroughly <br />cleaned before and after each run, and the debris and any water shall be <br />discharged outside the forms. Concrete shall not be allowed to flow horizontally <br />over distances exceeding 5 feet. <br /> <br />H. In thin sections of considerable height, concrete shall be placed using suitable <br />hoppers, spouts with restricted outlets, or otherwise, as required or approved. <br /> <br />I. Concrete during and immediately after depositing shall be thoroughly compacted <br />by means of suitable tools. Internal type mechanical vibrators shall be employed to <br />produce required quality of finish. Vibration shall be done by experienced <br />operators under close supervision and shall be carried on long enough to produce <br />homogeneity and optimum consolidation without permitting segregation of the solid <br /> <br />03300-9 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.