Laserfiche WebLink
<br />JUL-16-2007 MON 06:00 PM CALVIN GIORDANO FAX NO, 9549218807 <br />i <br /> <br />P. 03/05 <br /> <br /> 172NP STREET ROAD IMPROVEMENTS <br /> UNIT PRICE BID SCHEDULE <br />Item Estimated Estimated <br />No. Description Quantity Unit Unit Price Amount <br />I. GENERAL <br /> 1. Mobilization per FOOT (<5%) 1 LS 39, OC() .00 9~ 000- 00 <br /> 2. Maintenance of traffic per FOOT including <br /> temporary striping and signage, <br /> barricades, barriers, arrow panels, etc. as /q, C()() .00 ;q,tttJ.OO <br /> required. LS <br /> 3. Clearing and grubbing 1 LS lOG, 600.00 joo,5o(} 00 <br /> . <br /> 4. Pollution prevention and sediment control 1 LS /2, (xJo .00 12/ GOO. 00 <br /> 5. Earthwork 1 LS 2)./,600 {)() 2'6500.00 <br /> . <br /> 6. Relocation of existing mail box 1 EA .3 /5.tJO 3/5.00 <br /> GENERAL SUBTOTAL $ 200J R/5. 00 <br />II. CIVIL <br />A Demolition/Site Preparation <br /> 7. Asphalt pavement demolition (removal & 4936 SY 3.10 /~ 30/- 6D <br /> hauling) <br /> 8. Concrete sidewalk demolition (removal 1210 SY <f. 1,0 5, 06'2.00 <br /> and hauling) <br /> / <br /> 9. Catch basin to be abandoned in place and 15 CY /35. Of> 2, 77J' 00 <br /> filled with flowable flow <br /> 10. Existing drainage pipes to be filled with 80 CY I g 5.00 /~ gOO .00 <br /> flowable fill <br /> 11. Relocate or adjust existing street signs 3 EA /6 0 .00 tfgO .00 <br />B Paving <br /> 12, 1 W' Asphalt, Type 8-3 550 TN /6t .60 qJ./ (p 7~.Ol> <br /> 13. 12" Stabilized subgrade 5376 SY 3.66 L~ 2>{}3. 60 <br /> 14. 8" Limerock base 1076 CY IG'O() <br /> A , / 'if) . 00 <br /> 15.4" Concrete sidewalk 1522 SY 37.50 5~ () 7~' 00 <br /> 16. 6" Concrete driveway 379 8Y tftf. ~O 16,i65.fiO <br /> 17. Drop curb I 422 LF lb.1-0 0, fJ6 .qo <br /> 18. Type F curb and gutter 2415 LF 2() . 00 t/t,300.00 <br /> , <br /> <br />Final Version 6/07 00300-2 <br /> <br />03-4197 <br />Addendum 2 <br />